A fast outage planning method focusing on circuit breakers near outage facilities

Chihaya Murakami, Aya Fujiwara, Shinichi Iwamoto

    Research output: Contribution to journalArticlepeer-review

    2 Citations (Scopus)

    Abstract

    Japanese electric power utilities installed many electric power facilities for the increasing power demand in the high economic growth era. However these facilities have aged about 40 years and they should be replaced in the near future. The utilities will have to replace the facilities more than now at the same time because of the increase of the power facility replaces. Therefore the outage planning should take place more efficiently. However, to make the outage plan, it requires time and labor. Because the outage plan must determine 1 Outage schedule,2 Power system configuration during outage works and 3 System switching of the power system in order to conduct the outage works. To solve these problems, a fast outage planning method focusing on circuit breakers near the outage facilities is proposed in this paper. Finally, simulations are run using the IEEJ sub-transmission system model I to confirm the validity of the proposed method.

    Original languageEnglish
    Pages (from-to)746-752
    Number of pages7
    JournalIEEJ Transactions on Power and Energy
    Volume133
    Issue number10
    DOIs
    Publication statusPublished - 2013

    Keywords

    • Outage planning
    • Sub-transmission system
    • System switching
    • Tabu search
    • Traveling salesman problem

    ASJC Scopus subject areas

    • Electrical and Electronic Engineering
    • Energy Engineering and Power Technology

    Fingerprint

    Dive into the research topics of 'A fast outage planning method focusing on circuit breakers near outage facilities'. Together they form a unique fingerprint.

    Cite this