A new scheduling system with assumption-based inference

Y. Mishima, Harutoshi Ogai, K. Ishizaki, K. Shinkura

Research output: Chapter in Book/Report/Conference proceedingConference contribution

1 Citation (Scopus)

Abstract

An assumption-based inference system for solving scheduling problems in the steel-making process is proposed. Scheduling problems that are difficult to solve by an analytical method have been mainly solved by searching state space. However, the cost of solving the state-space problem is expensive. An assumption-based inference system that make it possible to search state space effectively and avoid combinational explosion by the pair coils exchange method was developed. To evaluate the approach, the system was applied to a steel production line for prototype use. It was confirmed that this system improved product quality.

Original languageEnglish
Title of host publicationIECON Proceedings (Industrial Electronics Conference)
Place of PublicationLos Alamitos, CA, United States
PublisherPubl by IEEE
Pages1298-1302
Number of pages5
Volume2
ISBN (Print)0879426004
Publication statusPublished - 1990
Externally publishedYes
Event16th Annual Conference of IEEE Industrial Electronics Society - IECON'90 - Pacific Grove, CA, USA
Duration: 1990 Nov 271990 Nov 30

Other

Other16th Annual Conference of IEEE Industrial Electronics Society - IECON'90
CityPacific Grove, CA, USA
Period90/11/2790/11/30

Fingerprint

Scheduling
Steel
Explosions
Costs

ASJC Scopus subject areas

  • Electrical and Electronic Engineering

Cite this

Mishima, Y., Ogai, H., Ishizaki, K., & Shinkura, K. (1990). A new scheduling system with assumption-based inference. In IECON Proceedings (Industrial Electronics Conference) (Vol. 2, pp. 1298-1302). Los Alamitos, CA, United States: Publ by IEEE.

A new scheduling system with assumption-based inference. / Mishima, Y.; Ogai, Harutoshi; Ishizaki, K.; Shinkura, K.

IECON Proceedings (Industrial Electronics Conference). Vol. 2 Los Alamitos, CA, United States : Publ by IEEE, 1990. p. 1298-1302.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Mishima, Y, Ogai, H, Ishizaki, K & Shinkura, K 1990, A new scheduling system with assumption-based inference. in IECON Proceedings (Industrial Electronics Conference). vol. 2, Publ by IEEE, Los Alamitos, CA, United States, pp. 1298-1302, 16th Annual Conference of IEEE Industrial Electronics Society - IECON'90, Pacific Grove, CA, USA, 90/11/27.
Mishima Y, Ogai H, Ishizaki K, Shinkura K. A new scheduling system with assumption-based inference. In IECON Proceedings (Industrial Electronics Conference). Vol. 2. Los Alamitos, CA, United States: Publ by IEEE. 1990. p. 1298-1302
Mishima, Y. ; Ogai, Harutoshi ; Ishizaki, K. ; Shinkura, K. / A new scheduling system with assumption-based inference. IECON Proceedings (Industrial Electronics Conference). Vol. 2 Los Alamitos, CA, United States : Publ by IEEE, 1990. pp. 1298-1302
@inproceedings{0110cec9ce374cc6b6845961a4de3afc,
title = "A new scheduling system with assumption-based inference",
abstract = "An assumption-based inference system for solving scheduling problems in the steel-making process is proposed. Scheduling problems that are difficult to solve by an analytical method have been mainly solved by searching state space. However, the cost of solving the state-space problem is expensive. An assumption-based inference system that make it possible to search state space effectively and avoid combinational explosion by the pair coils exchange method was developed. To evaluate the approach, the system was applied to a steel production line for prototype use. It was confirmed that this system improved product quality.",
author = "Y. Mishima and Harutoshi Ogai and K. Ishizaki and K. Shinkura",
year = "1990",
language = "English",
isbn = "0879426004",
volume = "2",
pages = "1298--1302",
booktitle = "IECON Proceedings (Industrial Electronics Conference)",
publisher = "Publ by IEEE",

}

TY - GEN

T1 - A new scheduling system with assumption-based inference

AU - Mishima, Y.

AU - Ogai, Harutoshi

AU - Ishizaki, K.

AU - Shinkura, K.

PY - 1990

Y1 - 1990

N2 - An assumption-based inference system for solving scheduling problems in the steel-making process is proposed. Scheduling problems that are difficult to solve by an analytical method have been mainly solved by searching state space. However, the cost of solving the state-space problem is expensive. An assumption-based inference system that make it possible to search state space effectively and avoid combinational explosion by the pair coils exchange method was developed. To evaluate the approach, the system was applied to a steel production line for prototype use. It was confirmed that this system improved product quality.

AB - An assumption-based inference system for solving scheduling problems in the steel-making process is proposed. Scheduling problems that are difficult to solve by an analytical method have been mainly solved by searching state space. However, the cost of solving the state-space problem is expensive. An assumption-based inference system that make it possible to search state space effectively and avoid combinational explosion by the pair coils exchange method was developed. To evaluate the approach, the system was applied to a steel production line for prototype use. It was confirmed that this system improved product quality.

UR - http://www.scopus.com/inward/record.url?scp=0025576592&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=0025576592&partnerID=8YFLogxK

M3 - Conference contribution

AN - SCOPUS:0025576592

SN - 0879426004

VL - 2

SP - 1298

EP - 1302

BT - IECON Proceedings (Industrial Electronics Conference)

PB - Publ by IEEE

CY - Los Alamitos, CA, United States

ER -