A study on the risk management of multi Kanban system in a closed loop supply chain

Kenichi Nakashima, Surendra M. Gupta

Research output: Contribution to journalArticle

14 Citations (Scopus)

Abstract

We present a pull system that uses a new approach to facilitate material control and scheduling in a disassembly environment and is called the multi Kanban system for disassembly (MKSD). Within the MKSD is an approach to optimize operation and mitigate supply chain risk factors as well. We also compare the performance of MKSD to its push counterpart. Various scenarios are explored using a case example. For the scenarios, the assumptions, input data and results are presented. The study clearly demonstrates the effectiveness of the multi Kanban system over the push system.

Original languageEnglish
Pages (from-to)65-68
Number of pages4
JournalInternational Journal of Production Economics
Volume139
Issue number1
DOIs
Publication statusPublished - 2012 Sep 1
Externally publishedYes

Fingerprint

Risk management
Supply chains
Scheduling
Closed-loop supply chain
Kanban
Disassembly
Scenarios

Keywords

  • Material Control
  • Multi Kanban System
  • Variability

ASJC Scopus subject areas

  • Industrial and Manufacturing Engineering
  • Business, Management and Accounting(all)
  • Management Science and Operations Research
  • Economics and Econometrics

Cite this

A study on the risk management of multi Kanban system in a closed loop supply chain. / Nakashima, Kenichi; Gupta, Surendra M.

In: International Journal of Production Economics, Vol. 139, No. 1, 01.09.2012, p. 65-68.

Research output: Contribution to journalArticle

@article{9fc74f48fe644630bbde04334fe092d4,
title = "A study on the risk management of multi Kanban system in a closed loop supply chain",
abstract = "We present a pull system that uses a new approach to facilitate material control and scheduling in a disassembly environment and is called the multi Kanban system for disassembly (MKSD). Within the MKSD is an approach to optimize operation and mitigate supply chain risk factors as well. We also compare the performance of MKSD to its push counterpart. Various scenarios are explored using a case example. For the scenarios, the assumptions, input data and results are presented. The study clearly demonstrates the effectiveness of the multi Kanban system over the push system.",
keywords = "Material Control, Multi Kanban System, Variability",
author = "Kenichi Nakashima and Gupta, {Surendra M.}",
year = "2012",
month = "9",
day = "1",
doi = "10.1016/j.ijpe.2012.03.016",
language = "English",
volume = "139",
pages = "65--68",
journal = "International Journal of Production Economics",
issn = "0925-5273",
publisher = "Elsevier",
number = "1",

}

TY - JOUR

T1 - A study on the risk management of multi Kanban system in a closed loop supply chain

AU - Nakashima, Kenichi

AU - Gupta, Surendra M.

PY - 2012/9/1

Y1 - 2012/9/1

N2 - We present a pull system that uses a new approach to facilitate material control and scheduling in a disassembly environment and is called the multi Kanban system for disassembly (MKSD). Within the MKSD is an approach to optimize operation and mitigate supply chain risk factors as well. We also compare the performance of MKSD to its push counterpart. Various scenarios are explored using a case example. For the scenarios, the assumptions, input data and results are presented. The study clearly demonstrates the effectiveness of the multi Kanban system over the push system.

AB - We present a pull system that uses a new approach to facilitate material control and scheduling in a disassembly environment and is called the multi Kanban system for disassembly (MKSD). Within the MKSD is an approach to optimize operation and mitigate supply chain risk factors as well. We also compare the performance of MKSD to its push counterpart. Various scenarios are explored using a case example. For the scenarios, the assumptions, input data and results are presented. The study clearly demonstrates the effectiveness of the multi Kanban system over the push system.

KW - Material Control

KW - Multi Kanban System

KW - Variability

UR - http://www.scopus.com/inward/record.url?scp=84863221574&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84863221574&partnerID=8YFLogxK

U2 - 10.1016/j.ijpe.2012.03.016

DO - 10.1016/j.ijpe.2012.03.016

M3 - Article

VL - 139

SP - 65

EP - 68

JO - International Journal of Production Economics

JF - International Journal of Production Economics

SN - 0925-5273

IS - 1

ER -