An electric power purchase strategy for bilateral contracts focusing on reliability of customers

Satoru Niioka, Ryuichi Yokoyama

    Research output: Contribution to journalArticle

    1 Citation (Scopus)

    Abstract

    With the introduction of the competitive electrical power market, large-scale customers can select electric power suppliers. Customers need to consider not only the economical efficiency but also reliability, to decide the amount of electrical power to purchase. This paper develops an economic electric power purchase strategy for customers focusing on reliability. A bilateral contract model expressing electric power suppliers as generators with a forced outage rate is proposed and introduced to assess potential outage risks of the bilateral contract between an electric power supplier and a customer. The outage-related cost, consisting of potential outage risks and the estimated outage cost, is also proposed and introduced as an index of the reliability on the customer side, and an optimal reliability level of a customer is obtained by using the index. Several numerical examples demonstrate the availability of the proposed electric power purchase decision method and reliability improvement strategies for customers are discussed.

    Original languageEnglish
    Pages (from-to)9-21
    Number of pages13
    JournalElectrical Engineering in Japan (English translation of Denki Gakkai Ronbunshi)
    Volume156
    Issue number4
    DOIs
    Publication statusPublished - 2006 Sep

    Fingerprint

    Outages
    Costs
    Availability
    Economics

    Keywords

    • Bilateral contract
    • Competitive market
    • Customers

    ASJC Scopus subject areas

    • Electrical and Electronic Engineering

    Cite this

    An electric power purchase strategy for bilateral contracts focusing on reliability of customers. / Niioka, Satoru; Yokoyama, Ryuichi.

    In: Electrical Engineering in Japan (English translation of Denki Gakkai Ronbunshi), Vol. 156, No. 4, 09.2006, p. 9-21.

    Research output: Contribution to journalArticle

    @article{23ebece1baed47cb96fa216eea2afea3,
    title = "An electric power purchase strategy for bilateral contracts focusing on reliability of customers",
    abstract = "With the introduction of the competitive electrical power market, large-scale customers can select electric power suppliers. Customers need to consider not only the economical efficiency but also reliability, to decide the amount of electrical power to purchase. This paper develops an economic electric power purchase strategy for customers focusing on reliability. A bilateral contract model expressing electric power suppliers as generators with a forced outage rate is proposed and introduced to assess potential outage risks of the bilateral contract between an electric power supplier and a customer. The outage-related cost, consisting of potential outage risks and the estimated outage cost, is also proposed and introduced as an index of the reliability on the customer side, and an optimal reliability level of a customer is obtained by using the index. Several numerical examples demonstrate the availability of the proposed electric power purchase decision method and reliability improvement strategies for customers are discussed.",
    keywords = "Bilateral contract, Competitive market, Customers",
    author = "Satoru Niioka and Ryuichi Yokoyama",
    year = "2006",
    month = "9",
    doi = "10.1002/eej.20345",
    language = "English",
    volume = "156",
    pages = "9--21",
    journal = "Electrical Engineering in Japan (English translation of Denki Gakkai Ronbunshi)",
    issn = "0424-7760",
    publisher = "John Wiley and Sons Inc.",
    number = "4",

    }

    TY - JOUR

    T1 - An electric power purchase strategy for bilateral contracts focusing on reliability of customers

    AU - Niioka, Satoru

    AU - Yokoyama, Ryuichi

    PY - 2006/9

    Y1 - 2006/9

    N2 - With the introduction of the competitive electrical power market, large-scale customers can select electric power suppliers. Customers need to consider not only the economical efficiency but also reliability, to decide the amount of electrical power to purchase. This paper develops an economic electric power purchase strategy for customers focusing on reliability. A bilateral contract model expressing electric power suppliers as generators with a forced outage rate is proposed and introduced to assess potential outage risks of the bilateral contract between an electric power supplier and a customer. The outage-related cost, consisting of potential outage risks and the estimated outage cost, is also proposed and introduced as an index of the reliability on the customer side, and an optimal reliability level of a customer is obtained by using the index. Several numerical examples demonstrate the availability of the proposed electric power purchase decision method and reliability improvement strategies for customers are discussed.

    AB - With the introduction of the competitive electrical power market, large-scale customers can select electric power suppliers. Customers need to consider not only the economical efficiency but also reliability, to decide the amount of electrical power to purchase. This paper develops an economic electric power purchase strategy for customers focusing on reliability. A bilateral contract model expressing electric power suppliers as generators with a forced outage rate is proposed and introduced to assess potential outage risks of the bilateral contract between an electric power supplier and a customer. The outage-related cost, consisting of potential outage risks and the estimated outage cost, is also proposed and introduced as an index of the reliability on the customer side, and an optimal reliability level of a customer is obtained by using the index. Several numerical examples demonstrate the availability of the proposed electric power purchase decision method and reliability improvement strategies for customers are discussed.

    KW - Bilateral contract

    KW - Competitive market

    KW - Customers

    UR - http://www.scopus.com/inward/record.url?scp=33747192277&partnerID=8YFLogxK

    UR - http://www.scopus.com/inward/citedby.url?scp=33747192277&partnerID=8YFLogxK

    U2 - 10.1002/eej.20345

    DO - 10.1002/eej.20345

    M3 - Article

    AN - SCOPUS:33747192277

    VL - 156

    SP - 9

    EP - 21

    JO - Electrical Engineering in Japan (English translation of Denki Gakkai Ronbunshi)

    JF - Electrical Engineering in Japan (English translation of Denki Gakkai Ronbunshi)

    SN - 0424-7760

    IS - 4

    ER -