An experimental study on the maintenance and repair of communication cable tunnels constructed by shield tunneling method

Teiichi Sudo, Takuya Ishikawa, Ryo Hirasawa, Hayato Hoshino, Atsushi Koizumi

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Abstract

    The current understanding is that aged deterioration poses a serious problem in the most of all communication cable tunnels that take an important role in information-oriented society. Lots of communication tunnels have been in existence for 30 years after construction, and there deteriorations by decrepitude have been coming to the surface. To use communication tunnels efficiently under this situation, suitable maintenance and repair are required. So, the establishment of the assessment method giving the correct strength diagnosis has become imperative. However, it remains to be elucidated how to evaluate soundness of tunnel appropriately in the limited funds and time. To establish the evaluation method, here we study structural performance of the tunnel itself and whether tunnel which a crack and corrosion generated can bear the purpose of use. In this study, we examined the degree of soundness about communication shield tunnels considering the main structural steel segment and also the secondary lining which is not expected its strength in the design. That is for the purpose of studying the practical and effective reinforcing method. Based on the perspective presented above, to establish analysis models about communication tunnels of various conditions, we confirmed each load bearing behavior of the steel segment and the secondary lining by seven experiments with a 1/2 scale models and numerical analyses. And the validity of an analysis model and the effect of the reinforcement construction method were investigated. The results of the study show the indicator of the maintenance management technique over the communication cable tunnels of various states.

    Original languageEnglish
    Title of host publicationLife-Cycle of Structural Systems: Design, Assessment, Maintenance and Management - Proceedings of the 4th International Symposium on Life-Cycle Civil Engineering, IALCCE 2014
    PublisherCRC Press/Balkema
    Pages678-685
    Number of pages8
    ISBN (Print)9781138001206
    Publication statusPublished - 2015
    Event4th International Symposium on Life-Cycle Civil Engineering, IALCCE 2014 - Tokyo, Japan
    Duration: 2014 Nov 162014 Nov 19

    Other

    Other4th International Symposium on Life-Cycle Civil Engineering, IALCCE 2014
    CountryJapan
    CityTokyo
    Period14/11/1614/11/19

    Fingerprint

    Telecommunication cables
    Tunnels
    Repair
    Communication
    Linings
    Deterioration
    Bearings (structural)
    Steel
    Reinforcement
    Corrosion
    Cracks

    ASJC Scopus subject areas

    • Civil and Structural Engineering
    • Safety, Risk, Reliability and Quality

    Cite this

    Sudo, T., Ishikawa, T., Hirasawa, R., Hoshino, H., & Koizumi, A. (2015). An experimental study on the maintenance and repair of communication cable tunnels constructed by shield tunneling method. In Life-Cycle of Structural Systems: Design, Assessment, Maintenance and Management - Proceedings of the 4th International Symposium on Life-Cycle Civil Engineering, IALCCE 2014 (pp. 678-685). CRC Press/Balkema.

    An experimental study on the maintenance and repair of communication cable tunnels constructed by shield tunneling method. / Sudo, Teiichi; Ishikawa, Takuya; Hirasawa, Ryo; Hoshino, Hayato; Koizumi, Atsushi.

    Life-Cycle of Structural Systems: Design, Assessment, Maintenance and Management - Proceedings of the 4th International Symposium on Life-Cycle Civil Engineering, IALCCE 2014. CRC Press/Balkema, 2015. p. 678-685.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Sudo, T, Ishikawa, T, Hirasawa, R, Hoshino, H & Koizumi, A 2015, An experimental study on the maintenance and repair of communication cable tunnels constructed by shield tunneling method. in Life-Cycle of Structural Systems: Design, Assessment, Maintenance and Management - Proceedings of the 4th International Symposium on Life-Cycle Civil Engineering, IALCCE 2014. CRC Press/Balkema, pp. 678-685, 4th International Symposium on Life-Cycle Civil Engineering, IALCCE 2014, Tokyo, Japan, 14/11/16.
    Sudo T, Ishikawa T, Hirasawa R, Hoshino H, Koizumi A. An experimental study on the maintenance and repair of communication cable tunnels constructed by shield tunneling method. In Life-Cycle of Structural Systems: Design, Assessment, Maintenance and Management - Proceedings of the 4th International Symposium on Life-Cycle Civil Engineering, IALCCE 2014. CRC Press/Balkema. 2015. p. 678-685
    Sudo, Teiichi ; Ishikawa, Takuya ; Hirasawa, Ryo ; Hoshino, Hayato ; Koizumi, Atsushi. / An experimental study on the maintenance and repair of communication cable tunnels constructed by shield tunneling method. Life-Cycle of Structural Systems: Design, Assessment, Maintenance and Management - Proceedings of the 4th International Symposium on Life-Cycle Civil Engineering, IALCCE 2014. CRC Press/Balkema, 2015. pp. 678-685
    @inproceedings{90a38d7ec7754ae59e8df5327d73bd06,
    title = "An experimental study on the maintenance and repair of communication cable tunnels constructed by shield tunneling method",
    abstract = "The current understanding is that aged deterioration poses a serious problem in the most of all communication cable tunnels that take an important role in information-oriented society. Lots of communication tunnels have been in existence for 30 years after construction, and there deteriorations by decrepitude have been coming to the surface. To use communication tunnels efficiently under this situation, suitable maintenance and repair are required. So, the establishment of the assessment method giving the correct strength diagnosis has become imperative. However, it remains to be elucidated how to evaluate soundness of tunnel appropriately in the limited funds and time. To establish the evaluation method, here we study structural performance of the tunnel itself and whether tunnel which a crack and corrosion generated can bear the purpose of use. In this study, we examined the degree of soundness about communication shield tunnels considering the main structural steel segment and also the secondary lining which is not expected its strength in the design. That is for the purpose of studying the practical and effective reinforcing method. Based on the perspective presented above, to establish analysis models about communication tunnels of various conditions, we confirmed each load bearing behavior of the steel segment and the secondary lining by seven experiments with a 1/2 scale models and numerical analyses. And the validity of an analysis model and the effect of the reinforcement construction method were investigated. The results of the study show the indicator of the maintenance management technique over the communication cable tunnels of various states.",
    author = "Teiichi Sudo and Takuya Ishikawa and Ryo Hirasawa and Hayato Hoshino and Atsushi Koizumi",
    year = "2015",
    language = "English",
    isbn = "9781138001206",
    pages = "678--685",
    booktitle = "Life-Cycle of Structural Systems: Design, Assessment, Maintenance and Management - Proceedings of the 4th International Symposium on Life-Cycle Civil Engineering, IALCCE 2014",
    publisher = "CRC Press/Balkema",

    }

    TY - GEN

    T1 - An experimental study on the maintenance and repair of communication cable tunnels constructed by shield tunneling method

    AU - Sudo, Teiichi

    AU - Ishikawa, Takuya

    AU - Hirasawa, Ryo

    AU - Hoshino, Hayato

    AU - Koizumi, Atsushi

    PY - 2015

    Y1 - 2015

    N2 - The current understanding is that aged deterioration poses a serious problem in the most of all communication cable tunnels that take an important role in information-oriented society. Lots of communication tunnels have been in existence for 30 years after construction, and there deteriorations by decrepitude have been coming to the surface. To use communication tunnels efficiently under this situation, suitable maintenance and repair are required. So, the establishment of the assessment method giving the correct strength diagnosis has become imperative. However, it remains to be elucidated how to evaluate soundness of tunnel appropriately in the limited funds and time. To establish the evaluation method, here we study structural performance of the tunnel itself and whether tunnel which a crack and corrosion generated can bear the purpose of use. In this study, we examined the degree of soundness about communication shield tunnels considering the main structural steel segment and also the secondary lining which is not expected its strength in the design. That is for the purpose of studying the practical and effective reinforcing method. Based on the perspective presented above, to establish analysis models about communication tunnels of various conditions, we confirmed each load bearing behavior of the steel segment and the secondary lining by seven experiments with a 1/2 scale models and numerical analyses. And the validity of an analysis model and the effect of the reinforcement construction method were investigated. The results of the study show the indicator of the maintenance management technique over the communication cable tunnels of various states.

    AB - The current understanding is that aged deterioration poses a serious problem in the most of all communication cable tunnels that take an important role in information-oriented society. Lots of communication tunnels have been in existence for 30 years after construction, and there deteriorations by decrepitude have been coming to the surface. To use communication tunnels efficiently under this situation, suitable maintenance and repair are required. So, the establishment of the assessment method giving the correct strength diagnosis has become imperative. However, it remains to be elucidated how to evaluate soundness of tunnel appropriately in the limited funds and time. To establish the evaluation method, here we study structural performance of the tunnel itself and whether tunnel which a crack and corrosion generated can bear the purpose of use. In this study, we examined the degree of soundness about communication shield tunnels considering the main structural steel segment and also the secondary lining which is not expected its strength in the design. That is for the purpose of studying the practical and effective reinforcing method. Based on the perspective presented above, to establish analysis models about communication tunnels of various conditions, we confirmed each load bearing behavior of the steel segment and the secondary lining by seven experiments with a 1/2 scale models and numerical analyses. And the validity of an analysis model and the effect of the reinforcement construction method were investigated. The results of the study show the indicator of the maintenance management technique over the communication cable tunnels of various states.

    UR - http://www.scopus.com/inward/record.url?scp=84941247670&partnerID=8YFLogxK

    UR - http://www.scopus.com/inward/citedby.url?scp=84941247670&partnerID=8YFLogxK

    M3 - Conference contribution

    SN - 9781138001206

    SP - 678

    EP - 685

    BT - Life-Cycle of Structural Systems: Design, Assessment, Maintenance and Management - Proceedings of the 4th International Symposium on Life-Cycle Civil Engineering, IALCCE 2014

    PB - CRC Press/Balkema

    ER -