Analysis of production data for 2007/2008 mallik gas hydrate production tests in Canada

Masanori Kurihara, Akihiko Sato, Kunihiro Funatsu, Hisanao Ouchi, Koji Yamamoto, Masaaki Numasawa, Takao Ebinuma, Hideo Narita, Yoshihiro Masuda, Scott R. Dallimore, Fred Wright, Douglas Ashford

Research output: Chapter in Book/Report/Conference proceedingConference contribution

24 Citations (Scopus)

Abstract

The methane hydrate (MH) production tests were conducted using the depressurization method in the JOGMEC/NRCan/Aurora Mallik production program in April 2007 and in March 2008. In addition to attaining the first and the only successful methane gas production to the surface from a MH reservoir by depressurization in the world, various data such as wellhead/bottomhole pressure, temperature, gas and water flow rates and the temperature along the casing measured by Distributed Temperature Sensing (DTS) systems were acquired during these tests. The flow rates of gas and water from the reservoir sand face were then estimated by the comprehensive analysis of these data. This paper clarifies the details of the estimation of gas and water flow rates based on these data, for the first time after the 2008 winter test. In 2007, a certain amount of gas and water were produced from a 12 m perforation interval in one of the major MH reservoirs at the Mallik site in Canada, by reducing the bottomhole pressure down to about 7 MPa. However, because of the irregular (on-off) pumping operations due probably to the excessive sand production, the produced gas was not directly delivered to the surface via the tubing, but was accumulated at the top of the casing. Hence, the gas production rate was calculated based on the continuously monitored bottomhole and casing head pressure. Since the produced water was injected into the aquifer located below the MH reservoir, it was impossible to directly measure the water pumping rate. The pumping rate and water production rates were accurately estimated by matching the bottomhole temperature through the numerical simulation using a wellbore model. In 2008, much larger and longer gas production was accomplished with a stepwise reduction of the bottomhole pressure down to about 4.5 MPa, preventing sands from flowing into the wellbore by the screen. In this test, both the gas and water were delivered to the surface, which enables the estimation of the gas and water flow rates from the reservoir sand face as well as liquid level in casing based on the monitored parameters. Investigating the production performances thus estimated, it was inferred what really happened in the reservoir during the tests. These insights must be beneficial for future exploration and development planning for MH resources.

Original languageEnglish
Title of host publicationSociety of Petroleum Engineers - International Oil and Gas Conference and Exhibition in China 2010, IOGCEC
Pages2908-2931
Number of pages24
Volume4
Publication statusPublished - 2010
Externally publishedYes
EventInternational Oil and Gas Conference and Exhibition in China 2010: Opportunities and Challenges in a Volatile Environment, IOGCEC - Beijing
Duration: 2010 Jun 82010 Jun 10

Other

OtherInternational Oil and Gas Conference and Exhibition in China 2010: Opportunities and Challenges in a Volatile Environment, IOGCEC
CityBeijing
Period10/6/810/6/10

Fingerprint

Gas hydrates
gas hydrate
Gases
Methane
methane
Hydrates
Water
gas flow
gas production
water flow
pumping
Sand
sand
Flow rate
gas
water
temperature
analysis
test
rate

ASJC Scopus subject areas

  • Geochemistry and Petrology
  • Energy Engineering and Power Technology
  • Fuel Technology

Cite this

Kurihara, M., Sato, A., Funatsu, K., Ouchi, H., Yamamoto, K., Numasawa, M., ... Ashford, D. (2010). Analysis of production data for 2007/2008 mallik gas hydrate production tests in Canada. In Society of Petroleum Engineers - International Oil and Gas Conference and Exhibition in China 2010, IOGCEC (Vol. 4, pp. 2908-2931)

Analysis of production data for 2007/2008 mallik gas hydrate production tests in Canada. / Kurihara, Masanori; Sato, Akihiko; Funatsu, Kunihiro; Ouchi, Hisanao; Yamamoto, Koji; Numasawa, Masaaki; Ebinuma, Takao; Narita, Hideo; Masuda, Yoshihiro; Dallimore, Scott R.; Wright, Fred; Ashford, Douglas.

Society of Petroleum Engineers - International Oil and Gas Conference and Exhibition in China 2010, IOGCEC. Vol. 4 2010. p. 2908-2931.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Kurihara, M, Sato, A, Funatsu, K, Ouchi, H, Yamamoto, K, Numasawa, M, Ebinuma, T, Narita, H, Masuda, Y, Dallimore, SR, Wright, F & Ashford, D 2010, Analysis of production data for 2007/2008 mallik gas hydrate production tests in Canada. in Society of Petroleum Engineers - International Oil and Gas Conference and Exhibition in China 2010, IOGCEC. vol. 4, pp. 2908-2931, International Oil and Gas Conference and Exhibition in China 2010: Opportunities and Challenges in a Volatile Environment, IOGCEC, Beijing, 10/6/8.
Kurihara M, Sato A, Funatsu K, Ouchi H, Yamamoto K, Numasawa M et al. Analysis of production data for 2007/2008 mallik gas hydrate production tests in Canada. In Society of Petroleum Engineers - International Oil and Gas Conference and Exhibition in China 2010, IOGCEC. Vol. 4. 2010. p. 2908-2931
Kurihara, Masanori ; Sato, Akihiko ; Funatsu, Kunihiro ; Ouchi, Hisanao ; Yamamoto, Koji ; Numasawa, Masaaki ; Ebinuma, Takao ; Narita, Hideo ; Masuda, Yoshihiro ; Dallimore, Scott R. ; Wright, Fred ; Ashford, Douglas. / Analysis of production data for 2007/2008 mallik gas hydrate production tests in Canada. Society of Petroleum Engineers - International Oil and Gas Conference and Exhibition in China 2010, IOGCEC. Vol. 4 2010. pp. 2908-2931
@inproceedings{66ef0f4be68e458ca0c44a903ef5ebe2,
title = "Analysis of production data for 2007/2008 mallik gas hydrate production tests in Canada",
abstract = "The methane hydrate (MH) production tests were conducted using the depressurization method in the JOGMEC/NRCan/Aurora Mallik production program in April 2007 and in March 2008. In addition to attaining the first and the only successful methane gas production to the surface from a MH reservoir by depressurization in the world, various data such as wellhead/bottomhole pressure, temperature, gas and water flow rates and the temperature along the casing measured by Distributed Temperature Sensing (DTS) systems were acquired during these tests. The flow rates of gas and water from the reservoir sand face were then estimated by the comprehensive analysis of these data. This paper clarifies the details of the estimation of gas and water flow rates based on these data, for the first time after the 2008 winter test. In 2007, a certain amount of gas and water were produced from a 12 m perforation interval in one of the major MH reservoirs at the Mallik site in Canada, by reducing the bottomhole pressure down to about 7 MPa. However, because of the irregular (on-off) pumping operations due probably to the excessive sand production, the produced gas was not directly delivered to the surface via the tubing, but was accumulated at the top of the casing. Hence, the gas production rate was calculated based on the continuously monitored bottomhole and casing head pressure. Since the produced water was injected into the aquifer located below the MH reservoir, it was impossible to directly measure the water pumping rate. The pumping rate and water production rates were accurately estimated by matching the bottomhole temperature through the numerical simulation using a wellbore model. In 2008, much larger and longer gas production was accomplished with a stepwise reduction of the bottomhole pressure down to about 4.5 MPa, preventing sands from flowing into the wellbore by the screen. In this test, both the gas and water were delivered to the surface, which enables the estimation of the gas and water flow rates from the reservoir sand face as well as liquid level in casing based on the monitored parameters. Investigating the production performances thus estimated, it was inferred what really happened in the reservoir during the tests. These insights must be beneficial for future exploration and development planning for MH resources.",
author = "Masanori Kurihara and Akihiko Sato and Kunihiro Funatsu and Hisanao Ouchi and Koji Yamamoto and Masaaki Numasawa and Takao Ebinuma and Hideo Narita and Yoshihiro Masuda and Dallimore, {Scott R.} and Fred Wright and Douglas Ashford",
year = "2010",
language = "English",
isbn = "9781617388866",
volume = "4",
pages = "2908--2931",
booktitle = "Society of Petroleum Engineers - International Oil and Gas Conference and Exhibition in China 2010, IOGCEC",

}

TY - GEN

T1 - Analysis of production data for 2007/2008 mallik gas hydrate production tests in Canada

AU - Kurihara, Masanori

AU - Sato, Akihiko

AU - Funatsu, Kunihiro

AU - Ouchi, Hisanao

AU - Yamamoto, Koji

AU - Numasawa, Masaaki

AU - Ebinuma, Takao

AU - Narita, Hideo

AU - Masuda, Yoshihiro

AU - Dallimore, Scott R.

AU - Wright, Fred

AU - Ashford, Douglas

PY - 2010

Y1 - 2010

N2 - The methane hydrate (MH) production tests were conducted using the depressurization method in the JOGMEC/NRCan/Aurora Mallik production program in April 2007 and in March 2008. In addition to attaining the first and the only successful methane gas production to the surface from a MH reservoir by depressurization in the world, various data such as wellhead/bottomhole pressure, temperature, gas and water flow rates and the temperature along the casing measured by Distributed Temperature Sensing (DTS) systems were acquired during these tests. The flow rates of gas and water from the reservoir sand face were then estimated by the comprehensive analysis of these data. This paper clarifies the details of the estimation of gas and water flow rates based on these data, for the first time after the 2008 winter test. In 2007, a certain amount of gas and water were produced from a 12 m perforation interval in one of the major MH reservoirs at the Mallik site in Canada, by reducing the bottomhole pressure down to about 7 MPa. However, because of the irregular (on-off) pumping operations due probably to the excessive sand production, the produced gas was not directly delivered to the surface via the tubing, but was accumulated at the top of the casing. Hence, the gas production rate was calculated based on the continuously monitored bottomhole and casing head pressure. Since the produced water was injected into the aquifer located below the MH reservoir, it was impossible to directly measure the water pumping rate. The pumping rate and water production rates were accurately estimated by matching the bottomhole temperature through the numerical simulation using a wellbore model. In 2008, much larger and longer gas production was accomplished with a stepwise reduction of the bottomhole pressure down to about 4.5 MPa, preventing sands from flowing into the wellbore by the screen. In this test, both the gas and water were delivered to the surface, which enables the estimation of the gas and water flow rates from the reservoir sand face as well as liquid level in casing based on the monitored parameters. Investigating the production performances thus estimated, it was inferred what really happened in the reservoir during the tests. These insights must be beneficial for future exploration and development planning for MH resources.

AB - The methane hydrate (MH) production tests were conducted using the depressurization method in the JOGMEC/NRCan/Aurora Mallik production program in April 2007 and in March 2008. In addition to attaining the first and the only successful methane gas production to the surface from a MH reservoir by depressurization in the world, various data such as wellhead/bottomhole pressure, temperature, gas and water flow rates and the temperature along the casing measured by Distributed Temperature Sensing (DTS) systems were acquired during these tests. The flow rates of gas and water from the reservoir sand face were then estimated by the comprehensive analysis of these data. This paper clarifies the details of the estimation of gas and water flow rates based on these data, for the first time after the 2008 winter test. In 2007, a certain amount of gas and water were produced from a 12 m perforation interval in one of the major MH reservoirs at the Mallik site in Canada, by reducing the bottomhole pressure down to about 7 MPa. However, because of the irregular (on-off) pumping operations due probably to the excessive sand production, the produced gas was not directly delivered to the surface via the tubing, but was accumulated at the top of the casing. Hence, the gas production rate was calculated based on the continuously monitored bottomhole and casing head pressure. Since the produced water was injected into the aquifer located below the MH reservoir, it was impossible to directly measure the water pumping rate. The pumping rate and water production rates were accurately estimated by matching the bottomhole temperature through the numerical simulation using a wellbore model. In 2008, much larger and longer gas production was accomplished with a stepwise reduction of the bottomhole pressure down to about 4.5 MPa, preventing sands from flowing into the wellbore by the screen. In this test, both the gas and water were delivered to the surface, which enables the estimation of the gas and water flow rates from the reservoir sand face as well as liquid level in casing based on the monitored parameters. Investigating the production performances thus estimated, it was inferred what really happened in the reservoir during the tests. These insights must be beneficial for future exploration and development planning for MH resources.

UR - http://www.scopus.com/inward/record.url?scp=78650623888&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=78650623888&partnerID=8YFLogxK

M3 - Conference contribution

AN - SCOPUS:78650623888

SN - 9781617388866

VL - 4

SP - 2908

EP - 2931

BT - Society of Petroleum Engineers - International Oil and Gas Conference and Exhibition in China 2010, IOGCEC

ER -