N2 - This paper deals with the partial scheduling adjustment in the autonomous distributed scheduling method. The scheduling adjustment for the production system is required when uncertainty occurs. In that case, it does not need to adjust the whole schedule, but only the partial schedule which receives a direct influence by uncertainty according to the variable situation. From the viewpoint of the distributed system, to implement a function which adjusts such a partial schedule, each machine needs to manage schedule and exchange information. It has been studied by some researchers in recent years. However, the partial scheduling adjustment has not been controlled to change the processing sequence of operations in a machine, namely interchanging operations. Therefore, we propose realizing a function interchanging operations in a machine to diminish the influence occurred by a delay of a certain operation.
AB - This paper deals with the partial scheduling adjustment in the autonomous distributed scheduling method. The scheduling adjustment for the production system is required when uncertainty occurs. In that case, it does not need to adjust the whole schedule, but only the partial schedule which receives a direct influence by uncertainty according to the variable situation. From the viewpoint of the distributed system, to implement a function which adjusts such a partial schedule, each machine needs to manage schedule and exchange information. It has been studied by some researchers in recent years. However, the partial scheduling adjustment has not been controlled to change the processing sequence of operations in a machine, namely interchanging operations. Therefore, we propose realizing a function interchanging operations in a machine to diminish the influence occurred by a delay of a certain operation.
KW - Autonomous
KW - Distributed
KW - Interchange
KW - Production scheduling
KW - Slack time
UR - http://www.scopus.com/inward/record.url?scp=45149107614&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=45149107614&partnerID=8YFLogxK
U2 - 10.1109/COASE.2006.326913
DO - 10.1109/COASE.2006.326913
M3 - Conference contribution
AN - SCOPUS:45149107614
SN - 1424403103
SN - 9781424403103
T3 - 2006 IEEE International Conference on Automation Science and Engineering, CASE
SP - 387
EP - 392
BT - 2006 IEEE International Conference on Automation Science and Engineering, CASE
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 2006 IEEE International Conference on Automation Science and Engineering, CASE
Y2 - 8 October 2006 through 10 October 2006
ER -