Conception of self-construction production scheduling system

Hai Xue, Xue Rui Zhang, Yasuhiro Shimizu, Shigeru Fujimura

Research output: Contribution to journalArticle

Abstract

With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.

Original languageEnglish
JournalIEEJ Transactions on Electronics, Information and Systems
Volume128
Issue number4
DOIs
Publication statusPublished - 2008

Fingerprint

Scheduling
Interoperability
Information technology
Innovation

Keywords

  • Gantt chart
  • Operational scheduling
  • Production management
  • Production scheduling

ASJC Scopus subject areas

  • Electrical and Electronic Engineering

Cite this

Conception of self-construction production scheduling system. / Xue, Hai; Zhang, Xue Rui; Shimizu, Yasuhiro; Fujimura, Shigeru.

In: IEEJ Transactions on Electronics, Information and Systems, Vol. 128, No. 4, 2008.

Research output: Contribution to journalArticle

@article{9ab12a9abd3c4558825c70198865a4b4,
title = "Conception of self-construction production scheduling system",
abstract = "With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.",
keywords = "Gantt chart, Operational scheduling, Production management, Production scheduling",
author = "Hai Xue and Zhang, {Xue Rui} and Yasuhiro Shimizu and Shigeru Fujimura",
year = "2008",
doi = "10.1541/ieejeiss.128.646",
language = "English",
volume = "128",
journal = "IEEJ Transactions on Electronics, Information and Systems",
issn = "0385-4221",
publisher = "The Institute of Electrical Engineers of Japan",
number = "4",

}

TY - JOUR

T1 - Conception of self-construction production scheduling system

AU - Xue, Hai

AU - Zhang, Xue Rui

AU - Shimizu, Yasuhiro

AU - Fujimura, Shigeru

PY - 2008

Y1 - 2008

N2 - With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.

AB - With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.

KW - Gantt chart

KW - Operational scheduling

KW - Production management

KW - Production scheduling

UR - http://www.scopus.com/inward/record.url?scp=72349096316&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=72349096316&partnerID=8YFLogxK

U2 - 10.1541/ieejeiss.128.646

DO - 10.1541/ieejeiss.128.646

M3 - Article

VL - 128

JO - IEEJ Transactions on Electronics, Information and Systems

JF - IEEJ Transactions on Electronics, Information and Systems

SN - 0385-4221

IS - 4

ER -