Condition based renewal and maintenance integrated planning

Hiroki Iijima, Shozo Takata

    Research output: Contribution to journalArticle

    3 Citations (Scopus)

    Abstract

    From the perspective of facility life cycle management, timely renewal and appropriate maintenance are important to minimizing life cycle cost and environmental loads. To determine whether a system should be renewed or the components replaced or repaired, we need to assess the condition and residual life of the items. This paper proposes a method for selecting the optimal treatment from among the following options: doing nothing, component replacement, and system renewal. This method takes into consideration the facility conditions and operation status identified through monitoring data, as well as the operation and maintenance history. The method was verified by application to the multi-split-type air-conditioning system of a commercial building.

    Original languageEnglish
    JournalCIRP Annals - Manufacturing Technology
    DOIs
    Publication statusAccepted/In press - 2016

    Fingerprint

    Life cycle
    Planning
    Air conditioning
    Monitoring
    Costs

    Keywords

    • Maintenance
    • Planning
    • Renewal

    ASJC Scopus subject areas

    • Mechanical Engineering
    • Industrial and Manufacturing Engineering

    Cite this

    Condition based renewal and maintenance integrated planning. / Iijima, Hiroki; Takata, Shozo.

    In: CIRP Annals - Manufacturing Technology, 2016.

    Research output: Contribution to journalArticle

    @article{3b1f99eca5224bf79c34466ad2a101a3,
    title = "Condition based renewal and maintenance integrated planning",
    abstract = "From the perspective of facility life cycle management, timely renewal and appropriate maintenance are important to minimizing life cycle cost and environmental loads. To determine whether a system should be renewed or the components replaced or repaired, we need to assess the condition and residual life of the items. This paper proposes a method for selecting the optimal treatment from among the following options: doing nothing, component replacement, and system renewal. This method takes into consideration the facility conditions and operation status identified through monitoring data, as well as the operation and maintenance history. The method was verified by application to the multi-split-type air-conditioning system of a commercial building.",
    keywords = "Maintenance, Planning, Renewal",
    author = "Hiroki Iijima and Shozo Takata",
    year = "2016",
    doi = "10.1016/j.cirp.2016.04.106",
    language = "English",
    journal = "CIRP Annals - Manufacturing Technology",
    issn = "0007-8506",
    publisher = "Elsevier USA",

    }

    TY - JOUR

    T1 - Condition based renewal and maintenance integrated planning

    AU - Iijima, Hiroki

    AU - Takata, Shozo

    PY - 2016

    Y1 - 2016

    N2 - From the perspective of facility life cycle management, timely renewal and appropriate maintenance are important to minimizing life cycle cost and environmental loads. To determine whether a system should be renewed or the components replaced or repaired, we need to assess the condition and residual life of the items. This paper proposes a method for selecting the optimal treatment from among the following options: doing nothing, component replacement, and system renewal. This method takes into consideration the facility conditions and operation status identified through monitoring data, as well as the operation and maintenance history. The method was verified by application to the multi-split-type air-conditioning system of a commercial building.

    AB - From the perspective of facility life cycle management, timely renewal and appropriate maintenance are important to minimizing life cycle cost and environmental loads. To determine whether a system should be renewed or the components replaced or repaired, we need to assess the condition and residual life of the items. This paper proposes a method for selecting the optimal treatment from among the following options: doing nothing, component replacement, and system renewal. This method takes into consideration the facility conditions and operation status identified through monitoring data, as well as the operation and maintenance history. The method was verified by application to the multi-split-type air-conditioning system of a commercial building.

    KW - Maintenance

    KW - Planning

    KW - Renewal

    UR - http://www.scopus.com/inward/record.url?scp=84992306747&partnerID=8YFLogxK

    UR - http://www.scopus.com/inward/citedby.url?scp=84992306747&partnerID=8YFLogxK

    U2 - 10.1016/j.cirp.2016.04.106

    DO - 10.1016/j.cirp.2016.04.106

    M3 - Article

    JO - CIRP Annals - Manufacturing Technology

    JF - CIRP Annals - Manufacturing Technology

    SN - 0007-8506

    ER -