Cost-benefit analysis of the roadside tree project by using contingent valuation method at shintora street

Tatsuto Kihara, Sakura Ihara, Haruka Tani, Hiroto Takaguchi

    Research output: Contribution to journalArticle

    Abstract

    In this study, I perform a cost-benefit analysis of the roadside tree project in the planning stage, by using the method of CVM. In CVM survey of trees project model in the Toranomon Street, I used two types of survey. (One shows the results of the thermal environment simulation, one does not) There was no difference between the result of the survey. As a result of the cost-benefit analysis, cost-benefit ratio from seven years after the effect was presented in the questionnaire begins obtained are more than 1, could be evaluated the roadside tree project is that it is reasonable.

    Original languageEnglish
    Pages (from-to)687-690
    Number of pages4
    JournalAIJ Journal of Technology and Design
    Volume23
    Issue number54
    DOIs
    Publication statusPublished - 2017 Jun 1

    Fingerprint

    Cost benefit analysis
    Roadsides
    Forestry
    Planning
    Costs

    Keywords

    • Contingent valuation method
    • Cost-benefit analysis
    • Heat island phenomenon
    • Roadside-tree
    • Thermal environment

    ASJC Scopus subject areas

    • Architecture
    • Building and Construction

    Cite this

    Cost-benefit analysis of the roadside tree project by using contingent valuation method at shintora street. / Kihara, Tatsuto; Ihara, Sakura; Tani, Haruka; Takaguchi, Hiroto.

    In: AIJ Journal of Technology and Design, Vol. 23, No. 54, 01.06.2017, p. 687-690.

    Research output: Contribution to journalArticle

    @article{d119636f3e7c49d8a31dff686f9f8e5d,
    title = "Cost-benefit analysis of the roadside tree project by using contingent valuation method at shintora street",
    abstract = "In this study, I perform a cost-benefit analysis of the roadside tree project in the planning stage, by using the method of CVM. In CVM survey of trees project model in the Toranomon Street, I used two types of survey. (One shows the results of the thermal environment simulation, one does not) There was no difference between the result of the survey. As a result of the cost-benefit analysis, cost-benefit ratio from seven years after the effect was presented in the questionnaire begins obtained are more than 1, could be evaluated the roadside tree project is that it is reasonable.",
    keywords = "Contingent valuation method, Cost-benefit analysis, Heat island phenomenon, Roadside-tree, Thermal environment",
    author = "Tatsuto Kihara and Sakura Ihara and Haruka Tani and Hiroto Takaguchi",
    year = "2017",
    month = "6",
    day = "1",
    doi = "10.3130/aijt.23.687",
    language = "English",
    volume = "23",
    pages = "687--690",
    journal = "AIJ Journal of Technology and Design",
    issn = "1341-9463",
    publisher = "Architectural Institute of Japan",
    number = "54",

    }

    TY - JOUR

    T1 - Cost-benefit analysis of the roadside tree project by using contingent valuation method at shintora street

    AU - Kihara, Tatsuto

    AU - Ihara, Sakura

    AU - Tani, Haruka

    AU - Takaguchi, Hiroto

    PY - 2017/6/1

    Y1 - 2017/6/1

    N2 - In this study, I perform a cost-benefit analysis of the roadside tree project in the planning stage, by using the method of CVM. In CVM survey of trees project model in the Toranomon Street, I used two types of survey. (One shows the results of the thermal environment simulation, one does not) There was no difference between the result of the survey. As a result of the cost-benefit analysis, cost-benefit ratio from seven years after the effect was presented in the questionnaire begins obtained are more than 1, could be evaluated the roadside tree project is that it is reasonable.

    AB - In this study, I perform a cost-benefit analysis of the roadside tree project in the planning stage, by using the method of CVM. In CVM survey of trees project model in the Toranomon Street, I used two types of survey. (One shows the results of the thermal environment simulation, one does not) There was no difference between the result of the survey. As a result of the cost-benefit analysis, cost-benefit ratio from seven years after the effect was presented in the questionnaire begins obtained are more than 1, could be evaluated the roadside tree project is that it is reasonable.

    KW - Contingent valuation method

    KW - Cost-benefit analysis

    KW - Heat island phenomenon

    KW - Roadside-tree

    KW - Thermal environment

    UR - http://www.scopus.com/inward/record.url?scp=85021023008&partnerID=8YFLogxK

    UR - http://www.scopus.com/inward/citedby.url?scp=85021023008&partnerID=8YFLogxK

    U2 - 10.3130/aijt.23.687

    DO - 10.3130/aijt.23.687

    M3 - Article

    VL - 23

    SP - 687

    EP - 690

    JO - AIJ Journal of Technology and Design

    JF - AIJ Journal of Technology and Design

    SN - 1341-9463

    IS - 54

    ER -