Flexible generator maintenance scheduling considering uncertainties of objectives and parameters

T. Niimura, M. Ziao, R. Yokoyama

    Research output: Contribution to journalArticle

    4 Citations (Scopus)

    Abstract

    This paper presents a flexible technique for generator maintenance scheduling considering economy-reliability coordination and the uncertainty of parameters. In this approach, the uncertain load pattern is evaluated by a fuzzy set. Also, the linguistic goals of operation in economic and reliability perspectives are represented by separate fuzzy sets. Under several constraints for feasibility of maintenance, the combinatorial scheduling problem is solved by the branch-and-bound technique. Numerical analyses have been done on practical power systems to evaluate the robustness and flexibility of the proposed approach.

    Original languageEnglish
    Pages (from-to)400-403
    Number of pages4
    JournalUnknown Journal
    Volume1
    Publication statusPublished - 1996

    Fingerprint

    fuzzy sets
    scheduling
    Fuzzy sets
    maintenance
    generators
    Scheduling
    linguistics
    economy
    Linguistics
    economics
    flexibility
    Economics
    Uncertainty

    ASJC Scopus subject areas

    • Hardware and Architecture
    • Electrical and Electronic Engineering

    Cite this

    Flexible generator maintenance scheduling considering uncertainties of objectives and parameters. / Niimura, T.; Ziao, M.; Yokoyama, R.

    In: Unknown Journal, Vol. 1, 1996, p. 400-403.

    Research output: Contribution to journalArticle

    Niimura, T. ; Ziao, M. ; Yokoyama, R. / Flexible generator maintenance scheduling considering uncertainties of objectives and parameters. In: Unknown Journal. 1996 ; Vol. 1. pp. 400-403.
    @article{dfcdf0eba12b4eff959d48d8f617e789,
    title = "Flexible generator maintenance scheduling considering uncertainties of objectives and parameters",
    abstract = "This paper presents a flexible technique for generator maintenance scheduling considering economy-reliability coordination and the uncertainty of parameters. In this approach, the uncertain load pattern is evaluated by a fuzzy set. Also, the linguistic goals of operation in economic and reliability perspectives are represented by separate fuzzy sets. Under several constraints for feasibility of maintenance, the combinatorial scheduling problem is solved by the branch-and-bound technique. Numerical analyses have been done on practical power systems to evaluate the robustness and flexibility of the proposed approach.",
    author = "T. Niimura and M. Ziao and R. Yokoyama",
    year = "1996",
    language = "English",
    volume = "1",
    pages = "400--403",
    journal = "Nuclear Physics A",
    issn = "0375-9474",
    publisher = "Elsevier",

    }

    TY - JOUR

    T1 - Flexible generator maintenance scheduling considering uncertainties of objectives and parameters

    AU - Niimura, T.

    AU - Ziao, M.

    AU - Yokoyama, R.

    PY - 1996

    Y1 - 1996

    N2 - This paper presents a flexible technique for generator maintenance scheduling considering economy-reliability coordination and the uncertainty of parameters. In this approach, the uncertain load pattern is evaluated by a fuzzy set. Also, the linguistic goals of operation in economic and reliability perspectives are represented by separate fuzzy sets. Under several constraints for feasibility of maintenance, the combinatorial scheduling problem is solved by the branch-and-bound technique. Numerical analyses have been done on practical power systems to evaluate the robustness and flexibility of the proposed approach.

    AB - This paper presents a flexible technique for generator maintenance scheduling considering economy-reliability coordination and the uncertainty of parameters. In this approach, the uncertain load pattern is evaluated by a fuzzy set. Also, the linguistic goals of operation in economic and reliability perspectives are represented by separate fuzzy sets. Under several constraints for feasibility of maintenance, the combinatorial scheduling problem is solved by the branch-and-bound technique. Numerical analyses have been done on practical power systems to evaluate the robustness and flexibility of the proposed approach.

    UR - http://www.scopus.com/inward/record.url?scp=0029705933&partnerID=8YFLogxK

    UR - http://www.scopus.com/inward/citedby.url?scp=0029705933&partnerID=8YFLogxK

    M3 - Article

    AN - SCOPUS:0029705933

    VL - 1

    SP - 400

    EP - 403

    JO - Nuclear Physics A

    JF - Nuclear Physics A

    SN - 0375-9474

    ER -