Abstract
A systematic scheduling method is required to modify the predetermined production schedules in order to cope with unforeseen changes in manufacturing systems. The objective of the present research is to propose a scheduling method based on GA (Genetic Algorithm) for modifying delayed production schedules due to the additional jobs, reactively. A prototype of reactive scheduling system is developed and applied to scheduling problems. The effectiveness of the proposed method is verified through the numerical expreriments of the reactive scheduling problems.
Original language | English |
---|---|
Pages (from-to) | 3299-3305 |
Number of pages | 7 |
Journal | Nihon Kikai Gakkai Ronbunshu, C Hen/Transactions of the Japan Society of Mechanical Engineers, Part C |
Volume | 71 |
Issue number | 11 |
DOIs | |
Publication status | Published - 2005 Nov |
Externally published | Yes |
Keywords
- Additional Jobs
- Genetic Algorithm
- Lower Bound
- Reactive Scheduling
- Variety
ASJC Scopus subject areas
- Mechanics of Materials
- Mechanical Engineering
- Industrial and Manufacturing Engineering