Ground Improvement by the Freezing Method for Underground Space Utilization

    Research output: Contribution to journalArticle

    Abstract

    In underground spaces under high water pressure, the need to seal the periphery and face of the working environment and establish a stable front is a challenging issue. One method of creating a stable working front and sealing it against underground water pressure is ground freezing. In this study, application of a freezing method for underground space utilization is investigated. A case study related to part of a comprehensive underground expansion project in a Tokyo suburb is considered. Construction includes a junction of a main tunnel with a rampway that connects the underground tunnel route to the ground surface. At this construction site, the segment connecting the main route and rampway needs to be widened. Because of this enlargement and sequence of tasks below the water table, a temporary stable working front and hydraulically waterproof zone are necessary. As an effective method of ground improvement, freezing is used. Ground behavior around the underground expanded periphery and on the greenfield level due to freezing and thawing action is predicted, and a parametric study of the effect of the surrounding soil stiffness on the freezing behavior is conducted. Additionally, the closing time between freezing pipes is also predicted.

    Original languageEnglish
    Pages (from-to)778-786
    Number of pages9
    JournalUnknown Journal
    Volume2016-January
    Issue number271 GSP
    DOIs
    Publication statusPublished - 2016

    Fingerprint

    ground improvement
    Freezing
    freezing
    water pressure
    tunnel
    tunnels
    Tunnels
    ground freezing
    study application
    routes
    water tables
    thawing
    sealing
    Thawing
    closing
    stiffness
    water table
    pipe
    Seals
    method

    ASJC Scopus subject areas

    • Civil and Structural Engineering
    • Architecture
    • Building and Construction
    • Geotechnical Engineering and Engineering Geology

    Cite this

    Ground Improvement by the Freezing Method for Underground Space Utilization. / Afshani Mehrabad, Alireza; Akaki, Hirokazu.

    In: Unknown Journal, Vol. 2016-January, No. 271 GSP, 2016, p. 778-786.

    Research output: Contribution to journalArticle

    @article{4cf3ecc5da6846a381aa3d170da14acf,
    title = "Ground Improvement by the Freezing Method for Underground Space Utilization",
    abstract = "In underground spaces under high water pressure, the need to seal the periphery and face of the working environment and establish a stable front is a challenging issue. One method of creating a stable working front and sealing it against underground water pressure is ground freezing. In this study, application of a freezing method for underground space utilization is investigated. A case study related to part of a comprehensive underground expansion project in a Tokyo suburb is considered. Construction includes a junction of a main tunnel with a rampway that connects the underground tunnel route to the ground surface. At this construction site, the segment connecting the main route and rampway needs to be widened. Because of this enlargement and sequence of tasks below the water table, a temporary stable working front and hydraulically waterproof zone are necessary. As an effective method of ground improvement, freezing is used. Ground behavior around the underground expanded periphery and on the greenfield level due to freezing and thawing action is predicted, and a parametric study of the effect of the surrounding soil stiffness on the freezing behavior is conducted. Additionally, the closing time between freezing pipes is also predicted.",
    author = "{Afshani Mehrabad}, Alireza and Hirokazu Akaki",
    year = "2016",
    doi = "10.1061/9780784480144.077",
    language = "English",
    volume = "2016-January",
    pages = "778--786",
    journal = "Nuclear Physics A",
    issn = "0375-9474",
    publisher = "Elsevier",
    number = "271 GSP",

    }

    TY - JOUR

    T1 - Ground Improvement by the Freezing Method for Underground Space Utilization

    AU - Afshani Mehrabad, Alireza

    AU - Akaki, Hirokazu

    PY - 2016

    Y1 - 2016

    N2 - In underground spaces under high water pressure, the need to seal the periphery and face of the working environment and establish a stable front is a challenging issue. One method of creating a stable working front and sealing it against underground water pressure is ground freezing. In this study, application of a freezing method for underground space utilization is investigated. A case study related to part of a comprehensive underground expansion project in a Tokyo suburb is considered. Construction includes a junction of a main tunnel with a rampway that connects the underground tunnel route to the ground surface. At this construction site, the segment connecting the main route and rampway needs to be widened. Because of this enlargement and sequence of tasks below the water table, a temporary stable working front and hydraulically waterproof zone are necessary. As an effective method of ground improvement, freezing is used. Ground behavior around the underground expanded periphery and on the greenfield level due to freezing and thawing action is predicted, and a parametric study of the effect of the surrounding soil stiffness on the freezing behavior is conducted. Additionally, the closing time between freezing pipes is also predicted.

    AB - In underground spaces under high water pressure, the need to seal the periphery and face of the working environment and establish a stable front is a challenging issue. One method of creating a stable working front and sealing it against underground water pressure is ground freezing. In this study, application of a freezing method for underground space utilization is investigated. A case study related to part of a comprehensive underground expansion project in a Tokyo suburb is considered. Construction includes a junction of a main tunnel with a rampway that connects the underground tunnel route to the ground surface. At this construction site, the segment connecting the main route and rampway needs to be widened. Because of this enlargement and sequence of tasks below the water table, a temporary stable working front and hydraulically waterproof zone are necessary. As an effective method of ground improvement, freezing is used. Ground behavior around the underground expanded periphery and on the greenfield level due to freezing and thawing action is predicted, and a parametric study of the effect of the surrounding soil stiffness on the freezing behavior is conducted. Additionally, the closing time between freezing pipes is also predicted.

    UR - http://www.scopus.com/inward/record.url?scp=84984984873&partnerID=8YFLogxK

    UR - http://www.scopus.com/inward/citedby.url?scp=84984984873&partnerID=8YFLogxK

    U2 - 10.1061/9780784480144.077

    DO - 10.1061/9780784480144.077

    M3 - Article

    AN - SCOPUS:84984984873

    VL - 2016-January

    SP - 778

    EP - 786

    JO - Nuclear Physics A

    JF - Nuclear Physics A

    SN - 0375-9474

    IS - 271 GSP

    ER -