Maximum continuous operation time control of PMSM with compressor loads of air conditioners under DC power supply loss

Jongwon Heo, Keiichiro Kondo

Research output: Contribution to journalArticle

4 Citations (Scopus)

Abstract

In this letter, a method to maximize the operation time, even in cases of longer power interruption, by minimizing the power lost by the load is developed using the Lagrange function.

Original languageEnglish
Pages (from-to)268-269
Number of pages2
JournalIEEJ Journal of Industry Applications
Volume7
Issue number3
DOIs
Publication statusPublished - 2018 Jan 1
Externally publishedYes

Fingerprint

Compressors
Air

Keywords

  • Continuous operation
  • Low inertial loads
  • PMSM
  • Power supply loss

ASJC Scopus subject areas

  • Automotive Engineering
  • Energy Engineering and Power Technology
  • Mechanical Engineering
  • Industrial and Manufacturing Engineering
  • Electrical and Electronic Engineering

Cite this

@article{921a7a0409804b6f9d930c2e6b9e8271,
title = "Maximum continuous operation time control of PMSM with compressor loads of air conditioners under DC power supply loss",
abstract = "In this letter, a method to maximize the operation time, even in cases of longer power interruption, by minimizing the power lost by the load is developed using the Lagrange function.",
keywords = "Continuous operation, Low inertial loads, PMSM, Power supply loss",
author = "Jongwon Heo and Keiichiro Kondo",
year = "2018",
month = "1",
day = "1",
doi = "10.1541/ieejjia.7.268",
language = "English",
volume = "7",
pages = "268--269",
journal = "IEEJ Journal of Industry Applications",
issn = "2187-1094",
publisher = "The Institute of Electrical Engineers of Japan",
number = "3",

}

TY - JOUR

T1 - Maximum continuous operation time control of PMSM with compressor loads of air conditioners under DC power supply loss

AU - Heo, Jongwon

AU - Kondo, Keiichiro

PY - 2018/1/1

Y1 - 2018/1/1

N2 - In this letter, a method to maximize the operation time, even in cases of longer power interruption, by minimizing the power lost by the load is developed using the Lagrange function.

AB - In this letter, a method to maximize the operation time, even in cases of longer power interruption, by minimizing the power lost by the load is developed using the Lagrange function.

KW - Continuous operation

KW - Low inertial loads

KW - PMSM

KW - Power supply loss

UR - http://www.scopus.com/inward/record.url?scp=85046271701&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=85046271701&partnerID=8YFLogxK

U2 - 10.1541/ieejjia.7.268

DO - 10.1541/ieejjia.7.268

M3 - Article

AN - SCOPUS:85046271701

VL - 7

SP - 268

EP - 269

JO - IEEJ Journal of Industry Applications

JF - IEEJ Journal of Industry Applications

SN - 2187-1094

IS - 3

ER -