Proving test on thermal-hydraulic performance of bwr fuel assemblies

Yoshiaki Tsukuda, Hiroshi Hayashi, Katsuichiro Kamimura, Toshiitsu Hattori, Hirohisa Kaneko, Shinichi Morooka, Torn Mitsutake, Miyuki Akiba, Nobuaki Abe, Masahiko Warashina, Yasuhiro Masuhara, Jiro Kimura, Akira Tanabe, Yuji Nishino, Koujun Isaka, Riichiro Suzuki

Research output: Contribution to journalArticle

1 Citation (Scopus)

Abstract

Nuclear Power Engineering Corporation (NUPEC) has conducted a proving test for thermal-hydraulic performance of BWR fuel (high-burnup 8×8, 9×9) assemblies entrusted by the Ministry of Economy, Trade and Industry (NUPEC-TH-B Project). The high-burnup 8×8 fuel (average fuel assembly discharge burnup: about 39.5GWd/t), has been utilized from 1991. And the 9 × 9 fuel (average fuel assembly discharge burnup: about 45GWd/t). has started to be used since 1999. There are two types (A-type and B-type) of fuel design in 9×9 fuel assembly. Using an electrically heated test assembly which simulated a BWR fuel bundle on full scale, flow induced vibration, pressure drop, critical power under steady state condition and post-boiling transition (post-BT) tests were carried out in an out-of pile test facility that can simulate the high pressure and high temperature conditions of BWRs. This paper completed the results of 9 × 9 fuel combined with the previously reported results of high-burnup 8×8 fuel. As a result of NUPEC-TH-B Project, the validity of the current BWR thermal-hydraulic design method was confirmed and the reliability of BWR thermo-hydraulic fuel performance was demonstrated. Based on the test data, a new correlation of the estimation of fuel rod vibration amplitude, new post-BT heat transfer and rewet correlations for the estimation of fuel rod surface temperature were developed.

Original languageEnglish
Pages (from-to)384-403
Number of pages20
JournalTransactions of the Atomic Energy Society of Japan
Volume1
Issue number4
DOIs
Publication statusPublished - 2002
Externally publishedYes

Fingerprint

Hydraulics
Nuclear energy
Hot Temperature
Boiling liquids
Industry
Test facilities
Pressure drop
Piles
Heat transfer
Temperature

Keywords

  • BWR type reactors
  • correlation
  • critical power
  • flow induced vibration
  • heat transfer
  • post-BT
  • pressure drop
  • reliability
  • rewet
  • thermal-hydraulic performance
  • vibration amplitude

ASJC Scopus subject areas

  • Nuclear Energy and Engineering
  • Safety, Risk, Reliability and Quality

Cite this

Proving test on thermal-hydraulic performance of bwr fuel assemblies. / Tsukuda, Yoshiaki; Hayashi, Hiroshi; Kamimura, Katsuichiro; Hattori, Toshiitsu; Kaneko, Hirohisa; Morooka, Shinichi; Mitsutake, Torn; Akiba, Miyuki; Abe, Nobuaki; Warashina, Masahiko; Masuhara, Yasuhiro; Kimura, Jiro; Tanabe, Akira; Nishino, Yuji; Isaka, Koujun; Suzuki, Riichiro.

In: Transactions of the Atomic Energy Society of Japan, Vol. 1, No. 4, 2002, p. 384-403.

Research output: Contribution to journalArticle

Tsukuda, Y, Hayashi, H, Kamimura, K, Hattori, T, Kaneko, H, Morooka, S, Mitsutake, T, Akiba, M, Abe, N, Warashina, M, Masuhara, Y, Kimura, J, Tanabe, A, Nishino, Y, Isaka, K & Suzuki, R 2002, 'Proving test on thermal-hydraulic performance of bwr fuel assemblies', Transactions of the Atomic Energy Society of Japan, vol. 1, no. 4, pp. 384-403. https://doi.org/10.3327/taesj2002.1.384
Tsukuda, Yoshiaki ; Hayashi, Hiroshi ; Kamimura, Katsuichiro ; Hattori, Toshiitsu ; Kaneko, Hirohisa ; Morooka, Shinichi ; Mitsutake, Torn ; Akiba, Miyuki ; Abe, Nobuaki ; Warashina, Masahiko ; Masuhara, Yasuhiro ; Kimura, Jiro ; Tanabe, Akira ; Nishino, Yuji ; Isaka, Koujun ; Suzuki, Riichiro. / Proving test on thermal-hydraulic performance of bwr fuel assemblies. In: Transactions of the Atomic Energy Society of Japan. 2002 ; Vol. 1, No. 4. pp. 384-403.
@article{9f5774765f40456ba184efd527a868fc,
title = "Proving test on thermal-hydraulic performance of bwr fuel assemblies",
abstract = "Nuclear Power Engineering Corporation (NUPEC) has conducted a proving test for thermal-hydraulic performance of BWR fuel (high-burnup 8×8, 9×9) assemblies entrusted by the Ministry of Economy, Trade and Industry (NUPEC-TH-B Project). The high-burnup 8×8 fuel (average fuel assembly discharge burnup: about 39.5GWd/t), has been utilized from 1991. And the 9 × 9 fuel (average fuel assembly discharge burnup: about 45GWd/t). has started to be used since 1999. There are two types (A-type and B-type) of fuel design in 9×9 fuel assembly. Using an electrically heated test assembly which simulated a BWR fuel bundle on full scale, flow induced vibration, pressure drop, critical power under steady state condition and post-boiling transition (post-BT) tests were carried out in an out-of pile test facility that can simulate the high pressure and high temperature conditions of BWRs. This paper completed the results of 9 × 9 fuel combined with the previously reported results of high-burnup 8×8 fuel. As a result of NUPEC-TH-B Project, the validity of the current BWR thermal-hydraulic design method was confirmed and the reliability of BWR thermo-hydraulic fuel performance was demonstrated. Based on the test data, a new correlation of the estimation of fuel rod vibration amplitude, new post-BT heat transfer and rewet correlations for the estimation of fuel rod surface temperature were developed.",
keywords = "BWR type reactors, correlation, critical power, flow induced vibration, heat transfer, post-BT, pressure drop, reliability, rewet, thermal-hydraulic performance, vibration amplitude",
author = "Yoshiaki Tsukuda and Hiroshi Hayashi and Katsuichiro Kamimura and Toshiitsu Hattori and Hirohisa Kaneko and Shinichi Morooka and Torn Mitsutake and Miyuki Akiba and Nobuaki Abe and Masahiko Warashina and Yasuhiro Masuhara and Jiro Kimura and Akira Tanabe and Yuji Nishino and Koujun Isaka and Riichiro Suzuki",
year = "2002",
doi = "10.3327/taesj2002.1.384",
language = "English",
volume = "1",
pages = "384--403",
journal = "Transactions of the Atomic Energy Society of Japan",
issn = "1347-2879",
publisher = "Atomic Energy Society of Japan",
number = "4",

}

TY - JOUR

T1 - Proving test on thermal-hydraulic performance of bwr fuel assemblies

AU - Tsukuda, Yoshiaki

AU - Hayashi, Hiroshi

AU - Kamimura, Katsuichiro

AU - Hattori, Toshiitsu

AU - Kaneko, Hirohisa

AU - Morooka, Shinichi

AU - Mitsutake, Torn

AU - Akiba, Miyuki

AU - Abe, Nobuaki

AU - Warashina, Masahiko

AU - Masuhara, Yasuhiro

AU - Kimura, Jiro

AU - Tanabe, Akira

AU - Nishino, Yuji

AU - Isaka, Koujun

AU - Suzuki, Riichiro

PY - 2002

Y1 - 2002

N2 - Nuclear Power Engineering Corporation (NUPEC) has conducted a proving test for thermal-hydraulic performance of BWR fuel (high-burnup 8×8, 9×9) assemblies entrusted by the Ministry of Economy, Trade and Industry (NUPEC-TH-B Project). The high-burnup 8×8 fuel (average fuel assembly discharge burnup: about 39.5GWd/t), has been utilized from 1991. And the 9 × 9 fuel (average fuel assembly discharge burnup: about 45GWd/t). has started to be used since 1999. There are two types (A-type and B-type) of fuel design in 9×9 fuel assembly. Using an electrically heated test assembly which simulated a BWR fuel bundle on full scale, flow induced vibration, pressure drop, critical power under steady state condition and post-boiling transition (post-BT) tests were carried out in an out-of pile test facility that can simulate the high pressure and high temperature conditions of BWRs. This paper completed the results of 9 × 9 fuel combined with the previously reported results of high-burnup 8×8 fuel. As a result of NUPEC-TH-B Project, the validity of the current BWR thermal-hydraulic design method was confirmed and the reliability of BWR thermo-hydraulic fuel performance was demonstrated. Based on the test data, a new correlation of the estimation of fuel rod vibration amplitude, new post-BT heat transfer and rewet correlations for the estimation of fuel rod surface temperature were developed.

AB - Nuclear Power Engineering Corporation (NUPEC) has conducted a proving test for thermal-hydraulic performance of BWR fuel (high-burnup 8×8, 9×9) assemblies entrusted by the Ministry of Economy, Trade and Industry (NUPEC-TH-B Project). The high-burnup 8×8 fuel (average fuel assembly discharge burnup: about 39.5GWd/t), has been utilized from 1991. And the 9 × 9 fuel (average fuel assembly discharge burnup: about 45GWd/t). has started to be used since 1999. There are two types (A-type and B-type) of fuel design in 9×9 fuel assembly. Using an electrically heated test assembly which simulated a BWR fuel bundle on full scale, flow induced vibration, pressure drop, critical power under steady state condition and post-boiling transition (post-BT) tests were carried out in an out-of pile test facility that can simulate the high pressure and high temperature conditions of BWRs. This paper completed the results of 9 × 9 fuel combined with the previously reported results of high-burnup 8×8 fuel. As a result of NUPEC-TH-B Project, the validity of the current BWR thermal-hydraulic design method was confirmed and the reliability of BWR thermo-hydraulic fuel performance was demonstrated. Based on the test data, a new correlation of the estimation of fuel rod vibration amplitude, new post-BT heat transfer and rewet correlations for the estimation of fuel rod surface temperature were developed.

KW - BWR type reactors

KW - correlation

KW - critical power

KW - flow induced vibration

KW - heat transfer

KW - post-BT

KW - pressure drop

KW - reliability

KW - rewet

KW - thermal-hydraulic performance

KW - vibration amplitude

UR - http://www.scopus.com/inward/record.url?scp=84930708063&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84930708063&partnerID=8YFLogxK

U2 - 10.3327/taesj2002.1.384

DO - 10.3327/taesj2002.1.384

M3 - Article

VL - 1

SP - 384

EP - 403

JO - Transactions of the Atomic Energy Society of Japan

JF - Transactions of the Atomic Energy Society of Japan

SN - 1347-2879

IS - 4

ER -