Abstract

At present, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be decreased. This paper shows a prototype of Gantt Chart Interface System that emulates the production scheduling work on papers. Through the analysis of operator's operations, this paper proposes how to extract the master information required by production scheduling. Using the information, the scheduling operators can be supported to accelerate the scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, the extraction mechanism of the master information and operator support functions are proposed through a model expressing a scheduling problem.

Original languageEnglish
Title of host publication2006 IEEE International Conference on Automation Science and Engineering, CASE
PublisherInstitute of Electrical and Electronics Engineers Inc.
Pages519-523
Number of pages5
ISBN (Print)1424403103, 9781424403103
DOIs
Publication statusPublished - 2006 Jan 1
Event2006 IEEE International Conference on Automation Science and Engineering, CASE - Shanghai, China
Duration: 2006 Oct 82006 Oct 10

Publication series

Name2006 IEEE International Conference on Automation Science and Engineering, CASE

Conference

Conference2006 IEEE International Conference on Automation Science and Engineering, CASE
CountryChina
CityShanghai
Period06/10/806/10/10

    Fingerprint

Keywords

  • Gantt chart
  • Operation scheduling
  • Production management
  • Production scheduling
  • Self-construction system

ASJC Scopus subject areas

  • Control and Systems Engineering
  • Electrical and Electronic Engineering

Cite this

Xuerui, Z., Xue, H., Shimizu, Y., & Fujimura, S. (2006). Self-construction production scheduling system. In 2006 IEEE International Conference on Automation Science and Engineering, CASE (pp. 519-523). [4120401] (2006 IEEE International Conference on Automation Science and Engineering, CASE). Institute of Electrical and Electronics Engineers Inc.. https://doi.org/10.1109/COASE.2006.326935