Transmission experiment using installed submarine cable for system upgrade with RZ-DPSK

I. Morita*, N. Takeda, N. Yoshikane, H. Tanaka

*Corresponding author for this work

Research output: Contribution to conferencePaperpeer-review

Abstract

We have shown that a capacity of the transpacific system designed to support 8 × 2.5 Gbit/s can be increased to a factor of eight by using 16 × 10 Gbit/s RZ-DPSK in transmission experiments using a deployed submarine cable.

Original languageEnglish
DOIs
Publication statusPublished - 2008
Externally publishedYes
Event2008 34th European Conference on Optical Communication, ECOC 2008 - Brussels, Belgium
Duration: 2008 Sept 212008 Sept 25

Other

Other2008 34th European Conference on Optical Communication, ECOC 2008
Country/TerritoryBelgium
CityBrussels
Period08/9/2108/9/25

ASJC Scopus subject areas

  • Electrical and Electronic Engineering
  • Electronic, Optical and Magnetic Materials

Fingerprint

Dive into the research topics of 'Transmission experiment using installed submarine cable for system upgrade with RZ-DPSK'. Together they form a unique fingerprint.

Cite this