A multi-stage optimal renewal planning method is proposed for an energy supply system installed into building from economic viewpoint. Based on the annualized costs method, the average annual total cost during the total evaluation period is formulated as the objective function to be minimized. This is formulated as one of the mixed-integer linear programming problem, and the numerical solution is carried out by using the GAMS/CPLEX solver. A numerical study is carried out for an energy supply system installed into an office building with total floor area of 15 000m2, and the optimal renewal system is proposed as the one of installing high performance equipment properly at each optimal renewal year.
本文言語 | English |
---|---|
ホスト出版物のタイトル | Proceeding of International Conference on Power Engineering, ICOPE 2009 |
出版社 | Japan Society of Mechanical Engineers |
出版ステータス | Published - 2009 |
イベント | 9th International Conference on Power Engineering, ICOPE 2009 - Kobe, Japan 継続期間: 2009 11月 16 → 2009 11月 20 |
Other
Other | 9th International Conference on Power Engineering, ICOPE 2009 |
---|---|
国/地域 | Japan |
City | Kobe |
Period | 09/11/16 → 09/11/20 |
ASJC Scopus subject areas
- 電子工学および電気工学
- エネルギー工学および電力技術
- 燃料技術