    To provide a risk-sharing mechanism that encourages a component supplier and a manufacturer to expand their production capacity of components and products, many researches on SCM suggested that it is better for the SC players to connect a long-term contract with flexible preconditions before doing the decision-making of production capacity. With considering of the uncertainty of demand and integrity problems between SC players, it is difficult to set reasonable preconditions. As a result, under-investment problems still occur frequently. In this paper, after we had discussed the decision-making of production capacity with the preconditions by analyzing the character of the players, we verified the under-investment problem of the supply chain. In order to clarify the optimum preconditions to alleviate the under-investment problem, we also analyzed the relations between preconditions and supply capacity of the whole supply chain. In the last part of this paper, we proposed a method of preconditions setting in such uncertain situations.

    元の言語English
    ホスト出版物のタイトル23rd International Conference for Production Research, ICPR 2015
    出版者International Foundation for Production Research (IFPR)
    出版物ステータスPublished - 2015
    イベント23rd International Conference for Production Research, ICPR 2015 - Manila, Philippines
    継続期間: 2015 8 22015 8 6

    Other

    Other23rd International Conference for Production Research, ICPR 2015
    Philippines
    Manila
    期間15/8/215/8/6

    Fingerprint

    Supply chains
    Decision making
    Uncertainty

    ASJC Scopus subject areas

    • Computer Science Applications
    • Control and Systems Engineering
    • Industrial and Manufacturing Engineering

    これを引用

    Wu, S., & Onari, H. (2015). A study on preconditions setting of long-term contract between manufacturer and component supplier. : 23rd International Conference for Production Research, ICPR 2015 International Foundation for Production Research (IFPR).

    A study on preconditions setting of long-term contract between manufacturer and component supplier. / Wu, Sidi; Onari, Hisashi.

    23rd International Conference for Production Research, ICPR 2015. International Foundation for Production Research (IFPR), 2015.

    研究成果: Conference contribution

    Wu, S & Onari, H 2015, A study on preconditions setting of long-term contract between manufacturer and component supplier. : 23rd International Conference for Production Research, ICPR 2015. International Foundation for Production Research (IFPR), 23rd International Conference for Production Research, ICPR 2015, Manila, Philippines, 15/8/2.
    Wu S, Onari H. A study on preconditions setting of long-term contract between manufacturer and component supplier. : 23rd International Conference for Production Research, ICPR 2015. International Foundation for Production Research (IFPR). 2015
    Wu, Sidi ; Onari, Hisashi. / A study on preconditions setting of long-term contract between manufacturer and component supplier. 23rd International Conference for Production Research, ICPR 2015. International Foundation for Production Research (IFPR), 2015.
    @inproceedings{8312b55ce0c445f9b6c4b4c080b16c33,
    title = "A study on preconditions setting of long-term contract between manufacturer and component supplier",
    abstract = "To provide a risk-sharing mechanism that encourages a component supplier and a manufacturer to expand their production capacity of components and products, many researches on SCM suggested that it is better for the SC players to connect a long-term contract with flexible preconditions before doing the decision-making of production capacity. With considering of the uncertainty of demand and integrity problems between SC players, it is difficult to set reasonable preconditions. As a result, under-investment problems still occur frequently. In this paper, after we had discussed the decision-making of production capacity with the preconditions by analyzing the character of the players, we verified the under-investment problem of the supply chain. In order to clarify the optimum preconditions to alleviate the under-investment problem, we also analyzed the relations between preconditions and supply capacity of the whole supply chain. In the last part of this paper, we proposed a method of preconditions setting in such uncertain situations.",
    keywords = "Contract, Production capacity, Supply chain management, Under investment",
    author = "Sidi Wu and Hisashi Onari",
    year = "2015",
    language = "English",
    booktitle = "23rd International Conference for Production Research, ICPR 2015",
    publisher = "International Foundation for Production Research (IFPR)",

    }

    TY - GEN

    T1 - A study on preconditions setting of long-term contract between manufacturer and component supplier

    AU - Wu, Sidi

    AU - Onari, Hisashi

    PY - 2015

    Y1 - 2015

    N2 - To provide a risk-sharing mechanism that encourages a component supplier and a manufacturer to expand their production capacity of components and products, many researches on SCM suggested that it is better for the SC players to connect a long-term contract with flexible preconditions before doing the decision-making of production capacity. With considering of the uncertainty of demand and integrity problems between SC players, it is difficult to set reasonable preconditions. As a result, under-investment problems still occur frequently. In this paper, after we had discussed the decision-making of production capacity with the preconditions by analyzing the character of the players, we verified the under-investment problem of the supply chain. In order to clarify the optimum preconditions to alleviate the under-investment problem, we also analyzed the relations between preconditions and supply capacity of the whole supply chain. In the last part of this paper, we proposed a method of preconditions setting in such uncertain situations.

    AB - To provide a risk-sharing mechanism that encourages a component supplier and a manufacturer to expand their production capacity of components and products, many researches on SCM suggested that it is better for the SC players to connect a long-term contract with flexible preconditions before doing the decision-making of production capacity. With considering of the uncertainty of demand and integrity problems between SC players, it is difficult to set reasonable preconditions. As a result, under-investment problems still occur frequently. In this paper, after we had discussed the decision-making of production capacity with the preconditions by analyzing the character of the players, we verified the under-investment problem of the supply chain. In order to clarify the optimum preconditions to alleviate the under-investment problem, we also analyzed the relations between preconditions and supply capacity of the whole supply chain. In the last part of this paper, we proposed a method of preconditions setting in such uncertain situations.

    KW - Contract

    KW - Production capacity

    KW - Supply chain management

    KW - Under investment

    UR - http://www.scopus.com/inward/record.url?scp=84949659151&partnerID=8YFLogxK

    UR - http://www.scopus.com/inward/citedby.url?scp=84949659151&partnerID=8YFLogxK

    M3 - Conference contribution

    AN - SCOPUS:84949659151

    BT - 23rd International Conference for Production Research, ICPR 2015

    PB - International Foundation for Production Research (IFPR)

    ER -