A transmission renewal planning method using Supply-end Reserves and Line Flow Sensitivities

Keisuke Ueda*, Yu Takamizawa, Shinichi Iwamoto, Yoshinori Kato, Masayuki Shimazu

*この研究の対応する著者

    研究成果: Article査読

    抄録

    With the high economic growth era until 1990s, the power demand increased sharply year by year. Therefore, the electric power utilities installed many electric power facilities along with the predicted demand. However, in recent years, fewer infrastructures have been installed because electric power demand growth is saturated due to low economic growth. Therefore, in electric power facilities planning, it has been necessary to form a rational renewal planning which also considers social influence factors such as the construction quantity. In this paper, we propose a new transmission renewal planning method using Supply-end Reserves and Line Flow Sensitivities. We carry out simulations for the IEEJ EAST 10-machine -O/V model system and determine the transmission planning priority order to confirm the validity of the proposed method.

    本文言語English
    ページ(範囲)175-180
    ページ数6
    ジャーナルIEEJ Transactions on Power and Energy
    131
    2
    DOI
    出版ステータスPublished - 2011

    ASJC Scopus subject areas

    • 電子工学および電気工学
    • エネルギー工学および電力技術

    フィンガープリント

    「A transmission renewal planning method using Supply-end Reserves and Line Flow Sensitivities」の研究トピックを掘り下げます。これらがまとまってユニークなフィンガープリントを構成します。

    引用スタイル