Applicability of earned value management for deadline energy constrained applications

研究成果

2 被引用数 (Scopus)

抄録

Earned Value Management (EVM) is a progress management method in project management. EVM is used as metrics to analyze execution statuses of projects that need to be accomplished within deadlines and limited budgets. By replacing budgets used in project management with energy used in applications, we can apply EVM as metrics to analyze execution statuses of Deadline Energy Constrained (DEC) applications that execute tasks within deadlines and limited energy. DEC applications are often seen in applications that need to consume energy within limits, for example, Wireless Sensor Networks (WSNs), Electric Cars (ECs), and Unmanned Aerial Vehicle (UAV). In this paper, we introduce new possibilities of applying EVM by showing that EVM can be used to analyze execution statuses of and make changes to DEC applications.

本文言語English
ホスト出版物のタイトル2017 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2017
出版社IEEE Computer Society
ページ691-695
ページ数5
2017-December
ISBN(電子版)9781538609484
DOI
出版ステータスPublished - 2018 2 9
外部発表はい
イベント2017 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2017 - Singapore, Singapore
継続期間: 2017 12 102017 12 13

Other

Other2017 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2017
国/地域Singapore
CitySingapore
Period17/12/1017/12/13

ASJC Scopus subject areas

  • ビジネス、管理および会計(その他)
  • 産業および生産工学
  • 安全性、リスク、信頼性、品質管理

フィンガープリント

「Applicability of earned value management for deadline energy constrained applications」の研究トピックを掘り下げます。これらがまとまってユニークなフィンガープリントを構成します。

引用スタイル