Buffer size setting method for DBR scheduling

Soonyoung Park*, Kiyun Woo, Shigeru Fujimura

*この研究の対応する著者

研究成果: Article査読

1 被引用数 (Scopus)

抄録

There are many kinds of delay in real-world production systems caused by many reasons including unexpected accidents. A delay of order may inflict great damages for not only itself but also the other affected orders. To prevent these types of loss from frequent delay, DBR (Drum-Buffer-Rope) scheduling method of TOG (Theory of Constraints) manages production schedule observing the state of time buffers. The current buffer size setting method for DBR scheduling is very simple and depends on user's experience. Although it makes possible to keep the due time for production orders, it leads to the redundant production lead time and stock. For DBR scheduling, it is not clear how the buffer size should be set. Therefore, this paper proposes a buffer size setting method for DBR scheduling providing a numerical model for the buffer size. In addition, a simulation gives the result of comparison between the current method and the proposed method, and the effect of the proposed method is shown.

本文言語English
ページ(範囲)416-424
ページ数9
ジャーナルIEEJ Transactions on Electronics, Information and Systems
127
3
DOI
出版ステータスPublished - 2007

ASJC Scopus subject areas

  • 電子工学および電気工学

フィンガープリント

「Buffer size setting method for DBR scheduling」の研究トピックを掘り下げます。これらがまとまってユニークなフィンガープリントを構成します。

引用スタイル