Comprehensive SC renewal planning scheme considering optimal allocation and reallocation

Katsuyuki Kimura*, Yuta Tanaka, Shinichi Iwamoto

*この研究の対応する著者

    研究成果: Conference contribution

    1 被引用数 (Scopus)

    抄録

    With the high economic growth period in Japan, the power demand has been increasing sharply year by year. Therefore, the Japanese utilities have installed Shunt Capacitors along with the predicted demand. Meanwhile, some SCs have been aged because they have been used for a long time. Therefore, they have to be replaced sometime soon. It is important to renew the aged SCs efficiently and economically. In this paper, we propose a new total SC renewal planning scheme using the voltage stability index L-index. This paper proposes an improved Particle Swarm Optimization (PSO) method. Since a search by PSO is considerably dependent on pbest and gbest, there is a possibility of settling in a local optimal solution. Therefore, Dispersed Hybrid PSO (DHPSO) is proposed to mitigate this drawback. We also proposed the optimal SC removal order scheme. Finally, we run simulations for the IEEJ 30 machine 115 bus system to confirm the validity of the proposed method.

    本文言語English
    ホスト出版物のタイトル2009 IEEE Power and Energy Society General Meeting, PES '09
    DOI
    出版ステータスPublished - 2009
    イベント2009 IEEE Power and Energy Society General Meeting, PES '09 - Calgary, AB
    継続期間: 2009 7 262009 7 30

    Other

    Other2009 IEEE Power and Energy Society General Meeting, PES '09
    CityCalgary, AB
    Period09/7/2609/7/30

    ASJC Scopus subject areas

    • エネルギー工学および電力技術
    • 電子工学および電気工学

    フィンガープリント

    「Comprehensive SC renewal planning scheme considering optimal allocation and reallocation」の研究トピックを掘り下げます。これらがまとまってユニークなフィンガープリントを構成します。

    引用スタイル