TY - JOUR
T1 - Conception of self-construction production scheduling system
AU - Xue, Hai
AU - Zhang, Xue Rui
AU - Shimizu, Yasuhiro
AU - Fujimura, Shigeru
PY - 2008
Y1 - 2008
N2 - With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.
AB - With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.
KW - Gantt chart
KW - Operational scheduling
KW - Production management
KW - Production scheduling
UR - http://www.scopus.com/inward/record.url?scp=72349096316&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=72349096316&partnerID=8YFLogxK
U2 - 10.1541/ieejeiss.128.646
DO - 10.1541/ieejeiss.128.646
M3 - Article
AN - SCOPUS:72349096316
VL - 128
SP - 646-655+15
JO - IEEJ Transactions on Electronics, Information and Systems
JF - IEEJ Transactions on Electronics, Information and Systems
SN - 0385-4221
IS - 4
ER -