Determination of the most suitable voltage control method depending on photovoltaic installation rate

Satoru Akagi, Ryo Takahashi, Akihisa Kaneko, Masakazu Ito, Jun Yoshinaga, Yasuhiro Hayashi, Hiromi Konda

研究成果: Conference contribution

抄録

In this study, we determine the suitable method and timing for the renewal of the voltage control method using voltage control performance evaluated by the maximum photovoltaic (PV) installation rate possible without voltage deviation. The voltage control method is renewed when the voltage of a distribution system deviates with an existing voltage control method. We determine the most suitable voltage control method, which extends the most PV systems, and define its renewal timing as the moment when the PV installation causes voltage deviation. For the renewal of the voltage control method, changing the control operation of a load ratio control transformer (LRT) and the additional installation of a static VAR compensator (SVC) are considered. A numerical simulation is performed to calculate the limit of PV installation rate of each voltage control method to determine the suitable one and its renewal timing.

元の言語English
ホスト出版物のタイトルAsia-Pacific Power and Energy Engineering Conference, APPEEC
出版者IEEE Computer Society
2016-January
ISBN(印刷物)9781467381321
DOI
出版物ステータスPublished - 2016 1 12
イベントIEEE PES Asia-Pacific Power and Energy Engineering Conference, APPEEC 2015 - Brisbane, Australia
継続期間: 2015 11 152015 11 18

Other

OtherIEEE PES Asia-Pacific Power and Energy Engineering Conference, APPEEC 2015
Australia
Brisbane
期間15/11/1515/11/18

Fingerprint

Voltage control
Electric potential
Computer simulation

ASJC Scopus subject areas

  • Energy Engineering and Power Technology

これを引用

Akagi, S., Takahashi, R., Kaneko, A., Ito, M., Yoshinaga, J., Hayashi, Y., & Konda, H. (2016). Determination of the most suitable voltage control method depending on photovoltaic installation rate. : Asia-Pacific Power and Energy Engineering Conference, APPEEC (巻 2016-January). [7380935] IEEE Computer Society. https://doi.org/10.1109/APPEEC.2015.7380935

Determination of the most suitable voltage control method depending on photovoltaic installation rate. / Akagi, Satoru; Takahashi, Ryo; Kaneko, Akihisa; Ito, Masakazu; Yoshinaga, Jun; Hayashi, Yasuhiro; Konda, Hiromi.

Asia-Pacific Power and Energy Engineering Conference, APPEEC. 巻 2016-January IEEE Computer Society, 2016. 7380935.

研究成果: Conference contribution

Akagi, S, Takahashi, R, Kaneko, A, Ito, M, Yoshinaga, J, Hayashi, Y & Konda, H 2016, Determination of the most suitable voltage control method depending on photovoltaic installation rate. : Asia-Pacific Power and Energy Engineering Conference, APPEEC. 巻. 2016-January, 7380935, IEEE Computer Society, IEEE PES Asia-Pacific Power and Energy Engineering Conference, APPEEC 2015, Brisbane, Australia, 15/11/15. https://doi.org/10.1109/APPEEC.2015.7380935
Akagi S, Takahashi R, Kaneko A, Ito M, Yoshinaga J, Hayashi Y その他. Determination of the most suitable voltage control method depending on photovoltaic installation rate. : Asia-Pacific Power and Energy Engineering Conference, APPEEC. 巻 2016-January. IEEE Computer Society. 2016. 7380935 https://doi.org/10.1109/APPEEC.2015.7380935
Akagi, Satoru ; Takahashi, Ryo ; Kaneko, Akihisa ; Ito, Masakazu ; Yoshinaga, Jun ; Hayashi, Yasuhiro ; Konda, Hiromi. / Determination of the most suitable voltage control method depending on photovoltaic installation rate. Asia-Pacific Power and Energy Engineering Conference, APPEEC. 巻 2016-January IEEE Computer Society, 2016.
@inproceedings{42eda58349764514a8f51f6cfbebd4f4,
title = "Determination of the most suitable voltage control method depending on photovoltaic installation rate",
abstract = "In this study, we determine the suitable method and timing for the renewal of the voltage control method using voltage control performance evaluated by the maximum photovoltaic (PV) installation rate possible without voltage deviation. The voltage control method is renewed when the voltage of a distribution system deviates with an existing voltage control method. We determine the most suitable voltage control method, which extends the most PV systems, and define its renewal timing as the moment when the PV installation causes voltage deviation. For the renewal of the voltage control method, changing the control operation of a load ratio control transformer (LRT) and the additional installation of a static VAR compensator (SVC) are considered. A numerical simulation is performed to calculate the limit of PV installation rate of each voltage control method to determine the suitable one and its renewal timing.",
keywords = "Line drop compensator (LDC), load ratio control transformer (LRT), photovoltaic (PV) system, static VAR compensator (SVC)",
author = "Satoru Akagi and Ryo Takahashi and Akihisa Kaneko and Masakazu Ito and Jun Yoshinaga and Yasuhiro Hayashi and Hiromi Konda",
year = "2016",
month = "1",
day = "12",
doi = "10.1109/APPEEC.2015.7380935",
language = "English",
isbn = "9781467381321",
volume = "2016-January",
booktitle = "Asia-Pacific Power and Energy Engineering Conference, APPEEC",
publisher = "IEEE Computer Society",

}

TY - GEN

T1 - Determination of the most suitable voltage control method depending on photovoltaic installation rate

AU - Akagi, Satoru

AU - Takahashi, Ryo

AU - Kaneko, Akihisa

AU - Ito, Masakazu

AU - Yoshinaga, Jun

AU - Hayashi, Yasuhiro

AU - Konda, Hiromi

PY - 2016/1/12

Y1 - 2016/1/12

N2 - In this study, we determine the suitable method and timing for the renewal of the voltage control method using voltage control performance evaluated by the maximum photovoltaic (PV) installation rate possible without voltage deviation. The voltage control method is renewed when the voltage of a distribution system deviates with an existing voltage control method. We determine the most suitable voltage control method, which extends the most PV systems, and define its renewal timing as the moment when the PV installation causes voltage deviation. For the renewal of the voltage control method, changing the control operation of a load ratio control transformer (LRT) and the additional installation of a static VAR compensator (SVC) are considered. A numerical simulation is performed to calculate the limit of PV installation rate of each voltage control method to determine the suitable one and its renewal timing.

AB - In this study, we determine the suitable method and timing for the renewal of the voltage control method using voltage control performance evaluated by the maximum photovoltaic (PV) installation rate possible without voltage deviation. The voltage control method is renewed when the voltage of a distribution system deviates with an existing voltage control method. We determine the most suitable voltage control method, which extends the most PV systems, and define its renewal timing as the moment when the PV installation causes voltage deviation. For the renewal of the voltage control method, changing the control operation of a load ratio control transformer (LRT) and the additional installation of a static VAR compensator (SVC) are considered. A numerical simulation is performed to calculate the limit of PV installation rate of each voltage control method to determine the suitable one and its renewal timing.

KW - Line drop compensator (LDC)

KW - load ratio control transformer (LRT)

KW - photovoltaic (PV) system

KW - static VAR compensator (SVC)

UR - http://www.scopus.com/inward/record.url?scp=84965076123&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84965076123&partnerID=8YFLogxK

U2 - 10.1109/APPEEC.2015.7380935

DO - 10.1109/APPEEC.2015.7380935

M3 - Conference contribution

AN - SCOPUS:84965076123

SN - 9781467381321

VL - 2016-January

BT - Asia-Pacific Power and Energy Engineering Conference, APPEEC

PB - IEEE Computer Society

ER -