Estimating job flow times by using an agent-based approach

研究成果: Conference contribution

1 被引用数 (Scopus)

抄録

We consider the problem of estimating flow times of jobs that arrive dynamically in a manufacturing system. A job's flow time refers to the time between the job's arrival and completion. Most existing methods use some predefined equations for such estimation, and most of the equations are designed for single machine manufacturing systems. To better estimate the flow time of a job in a more complex system in which there are multiple machines and multiple workstations, we propose a distributed learning approach that divides the manufacturing system into multiple small parts and collects real-time local information in each part to predict the waiting time for a job. We evaluate the proposed approach by comparing it with existing methods using a variety of problem instances. The results show that the proposed approach outperforms existing methods and accordingly might improve the level of customer service when being used for due date promising.

本文言語English
ホスト出版物のタイトルProceedings - 2016 5th IIAI International Congress on Advanced Applied Informatics, IIAI-AAI 2016
出版社Institute of Electrical and Electronics Engineers Inc.
ページ975-979
ページ数5
ISBN(電子版)9781467389853
DOI
出版ステータスPublished - 2016 8 31
イベント5th IIAI International Congress on Advanced Applied Informatics, IIAI-AAI 2016 - Kumamoto, Japan
継続期間: 2016 7 102016 7 14

Other

Other5th IIAI International Congress on Advanced Applied Informatics, IIAI-AAI 2016
国/地域Japan
CityKumamoto
Period16/7/1016/7/14

ASJC Scopus subject areas

  • 情報システム
  • コンピュータ ネットワークおよび通信
  • コンピュータ サイエンスの応用
  • コンピュータ ビジョンおよびパターン認識

フィンガープリント

「Estimating job flow times by using an agent-based approach」の研究トピックを掘り下げます。これらがまとまってユニークなフィンガープリントを構成します。

引用スタイル