抄録
The objective of the research is to develop a systematic method for evolutionary reactive scheduling. Previous researches provided a reactive scheduling method using a co-evolutionary genetic algorithm, which improved production schedules by changing both loading sequences of jobs on each resource and machining sequences of jobs. In this paper, we extend the previous reactive scheduling method under precedence constraints. A prototype of reactive scheduling system was developed in order to verify the effectiveness of the extended method. Some computational experiments demonstrated that the extended method was able to improve production schedules sufficiently regardless of the number of constraints.
本文言語 | English |
---|---|
出版ステータス | Published - 2011 12月 1 |
外部発表 | はい |
イベント | 6th International Conference on Leading Edge Manufacturing in 21st Century, LEM 2011 - Omiya Sonic City, Saitama, Japan 継続期間: 2011 11月 8 → 2011 11月 10 |
Other
Other | 6th International Conference on Leading Edge Manufacturing in 21st Century, LEM 2011 |
---|---|
国/地域 | Japan |
City | Omiya Sonic City, Saitama |
Period | 11/11/8 → 11/11/10 |
ASJC Scopus subject areas
- 産業および生産工学