抄録
A systematic scheduling method is required to modify the predetermined production schedules in order to cope with unforeseen changes in manufacturing systems. The objective of the present research is to propose a scheduling method based on GA (Genetic Algorithm) for modifying delayed production schedules due to the additional jobs, reactively. A prototype of reactive scheduling system is developed and applied to scheduling problems. The effectiveness of the proposed method is verified through the numerical expreriments of the reactive scheduling problems.
本文言語 | English |
---|---|
ページ(範囲) | 3299-3305 |
ページ数 | 7 |
ジャーナル | Nihon Kikai Gakkai Ronbunshu, C Hen/Transactions of the Japan Society of Mechanical Engineers, Part C |
巻 | 71 |
号 | 11 |
DOI | |
出版ステータス | Published - 2005 11月 |
外部発表 | はい |
ASJC Scopus subject areas
- 材料力学
- 機械工学
- 産業および生産工学