抄録
Unscheduled disruptions often occur in the actual manufacturing systems. A systematic scheduling method is therefore required to modify and improve the initial production schedule in order to cope with the unexpected disturbances. The previous researches proposed the Genetic Algorithm based reactive scheduling method that improves the initial production schedule without interrupting the manufacturing processes. This research proposes a new crossover method based on the dominance of gene in order to modify the production schedule faster than the previous method.
本文言語 | English |
---|---|
ページ | 427-432 |
ページ数 | 6 |
出版ステータス | Published - 2005 |
外部発表 | はい |
イベント | 3rd International Conference on Leading Edge Manufacturing in 21st Century, LEM 2005 - Nagoya, Japan 継続期間: 2005 10月 19 → 2005 10月 22 |
Other
Other | 3rd International Conference on Leading Edge Manufacturing in 21st Century, LEM 2005 |
---|---|
国/地域 | Japan |
City | Nagoya |
Period | 05/10/19 → 05/10/22 |
ASJC Scopus subject areas
- 産業および生産工学