TY - JOUR
T1 - Japan's first operation of high-temperature superconducting cable systems in live grids (high-temperature superconducting cable demonstration project)
AU - Ohya, Masayoshi
AU - Yumura, Hiroyasu
AU - Watanabe, Michihiko
AU - Ashibe, Yuichi
AU - Takigawa, Hiroshi
AU - Ito, Hideki
AU - Minamino, Tadahiko
AU - Nishimura, Takashi
AU - Masuda, Takato
AU - Honjo, Shoichi
AU - Mimura, Tomoo
AU - Kito, Yutaka
AU - Noguchi, Yu
PY - 2010/4
Y1 - 2010/4
N2 - Sumitomo Electric Industries, Ltd. has taken part in the high-temperature superconducting (HTS) cable demonstration project, began in 2007, to verify the reliability and operational stability of HTS cable systems in actual power grids. The company has developed 66-kV-, 200-MVA-class HTS cables, terminations and joints, and built a 30-meter cable system using them to conduct verification tests before the demonstration in Tokyo Electric Power Company's Asahi Substation in Yokohama. At present, Phase I of the rating validation test has been completed with favorable results, verifying the soundness of the 30-m cable system. A 30-day long-term operation test was also completed successfully. Going forward, Sumitomo Electric will conduct heat cycle and marginal performance tests with the system in Phase II and Phase III.
AB - Sumitomo Electric Industries, Ltd. has taken part in the high-temperature superconducting (HTS) cable demonstration project, began in 2007, to verify the reliability and operational stability of HTS cable systems in actual power grids. The company has developed 66-kV-, 200-MVA-class HTS cables, terminations and joints, and built a 30-meter cable system using them to conduct verification tests before the demonstration in Tokyo Electric Power Company's Asahi Substation in Yokohama. At present, Phase I of the rating validation test has been completed with favorable results, verifying the soundness of the 30-m cable system. A 30-day long-term operation test was also completed successfully. Going forward, Sumitomo Electric will conduct heat cycle and marginal performance tests with the system in Phase II and Phase III.
KW - High temperature superconductors
KW - Power cable installation
KW - Superconducting cables
UR - http://www.scopus.com/inward/record.url?scp=77952688466&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=77952688466&partnerID=8YFLogxK
M3 - Review article
AN - SCOPUS:77952688466
SP - 84
EP - 93
JO - Sumitomo Electric Technical Review
JF - Sumitomo Electric Technical Review
SN - 1343-4349
IS - 70
ER -