Distribution systems are changing from one-source supplying structure into multi-source supplying structure with participations of distributed generations (DGs). These changes face problems caused by DGs. This paper considers typical problems such as system operating limits, reach reduction of utility relay, and fault ride through requirement from distribution system operators (DSOs) in order to maximize DG installation. A new fault calculation technique for a system with inverter-based DGs is revised and employed in an algorithm proposed for maximizing DGs. The IEEE 34 Node Test Feeder is then used to illustrate the effectiveness of the algorithm in determining the maximum allowable DG installed in this system.
本文言語 | English |
---|---|
ホスト出版物のタイトル | 10th International Power and Energy Conference, IPEC 2012 |
ページ | 127-134 |
ページ数 | 8 |
DOI | |
出版ステータス | Published - 2012 |
外部発表 | はい |
イベント | 10th International Power and Energy Conference, IPEC 2012 - Ho Chi Minh City 継続期間: 2012 12月 12 → 2012 12月 13 |
Other
Other | 10th International Power and Energy Conference, IPEC 2012 |
---|---|
City | Ho Chi Minh City |
Period | 12/12/12 → 12/12/13 |
ASJC Scopus subject areas
- エネルギー工学および電力技術
- 燃料技術