Methods to estimate the lead time of an order in a flexible flowshop

研究成果: Conference contribution

抜粋

We consider the problem of estimating lead times of orders that arrive dynamically in a flexible flow shop. When an order arrives, we estimate the time between its arrival and its completion. Good estimation would help improve on-time delivery. Existing estimation methods are mostly designed based on an order's processing time and the shop's inventory status. We improve the accuracy of estimation by developing new methods that further take into account the characteristics of the shop system such as parallelization of queues. We also consider the bottleneck effect, which might largely dominate the waiting time in the system. Results of computational experiments show that the proposed methods outperform existing methods in terms of some accuracy measures.

元の言語English
ホスト出版物のタイトルProceedings - 2016 IEEE International Conference on Industrial Technology, ICIT 2016
出版者Institute of Electrical and Electronics Engineers Inc.
ページ1353-1356
ページ数4
2016-May
ISBN(電子版)9781467380751
DOI
出版物ステータスPublished - 2016 5 19
イベントIEEE International Conference on Industrial Technology, ICIT 2016 - Taipei, Taiwan, Province of China
継続期間: 2016 3 142016 3 17

Other

OtherIEEE International Conference on Industrial Technology, ICIT 2016
Taiwan, Province of China
Taipei
期間16/3/1416/3/17

ASJC Scopus subject areas

  • Electrical and Electronic Engineering
  • Computer Science Applications

フィンガープリント Methods to estimate the lead time of an order in a flexible flowshop' の研究トピックを掘り下げます。これらはともに一意のフィンガープリントを構成します。

  • これを引用

    Weng, W., & Fujimura, S. (2016). Methods to estimate the lead time of an order in a flexible flowshop. : Proceedings - 2016 IEEE International Conference on Industrial Technology, ICIT 2016 (巻 2016-May, pp. 1353-1356). [7474954] Institute of Electrical and Electronics Engineers Inc.. https://doi.org/10.1109/ICIT.2016.7474954