Methods to estimate the lead time of an order in a flexible flowshop

研究成果: Conference contribution

1 被引用数 (Scopus)

抄録

We consider the problem of estimating lead times of orders that arrive dynamically in a flexible flow shop. When an order arrives, we estimate the time between its arrival and its completion. Good estimation would help improve on-time delivery. Existing estimation methods are mostly designed based on an order's processing time and the shop's inventory status. We improve the accuracy of estimation by developing new methods that further take into account the characteristics of the shop system such as parallelization of queues. We also consider the bottleneck effect, which might largely dominate the waiting time in the system. Results of computational experiments show that the proposed methods outperform existing methods in terms of some accuracy measures.

本文言語English
ホスト出版物のタイトルProceedings - 2016 IEEE International Conference on Industrial Technology, ICIT 2016
出版社Institute of Electrical and Electronics Engineers Inc.
ページ1353-1356
ページ数4
2016-May
ISBN(電子版)9781467380751
DOI
出版ステータスPublished - 2016 5 19
イベントIEEE International Conference on Industrial Technology, ICIT 2016 - Taipei, Taiwan, Province of China
継続期間: 2016 3 142016 3 17

Other

OtherIEEE International Conference on Industrial Technology, ICIT 2016
国/地域Taiwan, Province of China
CityTaipei
Period16/3/1416/3/17

ASJC Scopus subject areas

  • 電子工学および電気工学
  • コンピュータ サイエンスの応用

フィンガープリント

「Methods to estimate the lead time of an order in a flexible flowshop」の研究トピックを掘り下げます。これらがまとまってユニークなフィンガープリントを構成します。

引用スタイル