Methods to estimate the lead time of an order in a flexible flowshop

研究成果: Conference contribution

抄録

We consider the problem of estimating lead times of orders that arrive dynamically in a flexible flow shop. When an order arrives, we estimate the time between its arrival and its completion. Good estimation would help improve on-time delivery. Existing estimation methods are mostly designed based on an order's processing time and the shop's inventory status. We improve the accuracy of estimation by developing new methods that further take into account the characteristics of the shop system such as parallelization of queues. We also consider the bottleneck effect, which might largely dominate the waiting time in the system. Results of computational experiments show that the proposed methods outperform existing methods in terms of some accuracy measures.

元の言語English
ホスト出版物のタイトルProceedings - 2016 IEEE International Conference on Industrial Technology, ICIT 2016
出版者Institute of Electrical and Electronics Engineers Inc.
ページ1353-1356
ページ数4
2016-May
ISBN(電子版)9781467380751
DOI
出版物ステータスPublished - 2016 5 19
イベントIEEE International Conference on Industrial Technology, ICIT 2016 - Taipei, Taiwan, Province of China
継続期間: 2016 3 142016 3 17

Other

OtherIEEE International Conference on Industrial Technology, ICIT 2016
Taiwan, Province of China
Taipei
期間16/3/1416/3/17

Fingerprint

Processing
Experiments

ASJC Scopus subject areas

  • Electrical and Electronic Engineering
  • Computer Science Applications

これを引用

Weng, W., & Fujimura, S. (2016). Methods to estimate the lead time of an order in a flexible flowshop. : Proceedings - 2016 IEEE International Conference on Industrial Technology, ICIT 2016 (巻 2016-May, pp. 1353-1356). [7474954] Institute of Electrical and Electronics Engineers Inc.. https://doi.org/10.1109/ICIT.2016.7474954

Methods to estimate the lead time of an order in a flexible flowshop. / Weng, Wei; Fujimura, Shigeru.

Proceedings - 2016 IEEE International Conference on Industrial Technology, ICIT 2016. 巻 2016-May Institute of Electrical and Electronics Engineers Inc., 2016. p. 1353-1356 7474954.

研究成果: Conference contribution

Weng, W & Fujimura, S 2016, Methods to estimate the lead time of an order in a flexible flowshop. : Proceedings - 2016 IEEE International Conference on Industrial Technology, ICIT 2016. 巻. 2016-May, 7474954, Institute of Electrical and Electronics Engineers Inc., pp. 1353-1356, IEEE International Conference on Industrial Technology, ICIT 2016, Taipei, Taiwan, Province of China, 16/3/14. https://doi.org/10.1109/ICIT.2016.7474954
Weng W, Fujimura S. Methods to estimate the lead time of an order in a flexible flowshop. : Proceedings - 2016 IEEE International Conference on Industrial Technology, ICIT 2016. 巻 2016-May. Institute of Electrical and Electronics Engineers Inc. 2016. p. 1353-1356. 7474954 https://doi.org/10.1109/ICIT.2016.7474954
Weng, Wei ; Fujimura, Shigeru. / Methods to estimate the lead time of an order in a flexible flowshop. Proceedings - 2016 IEEE International Conference on Industrial Technology, ICIT 2016. 巻 2016-May Institute of Electrical and Electronics Engineers Inc., 2016. pp. 1353-1356
@inproceedings{66541ede542b487080c78ad1912f586e,
title = "Methods to estimate the lead time of an order in a flexible flowshop",
abstract = "We consider the problem of estimating lead times of orders that arrive dynamically in a flexible flow shop. When an order arrives, we estimate the time between its arrival and its completion. Good estimation would help improve on-time delivery. Existing estimation methods are mostly designed based on an order's processing time and the shop's inventory status. We improve the accuracy of estimation by developing new methods that further take into account the characteristics of the shop system such as parallelization of queues. We also consider the bottleneck effect, which might largely dominate the waiting time in the system. Results of computational experiments show that the proposed methods outperform existing methods in terms of some accuracy measures.",
author = "Wei Weng and Shigeru Fujimura",
year = "2016",
month = "5",
day = "19",
doi = "10.1109/ICIT.2016.7474954",
language = "English",
volume = "2016-May",
pages = "1353--1356",
booktitle = "Proceedings - 2016 IEEE International Conference on Industrial Technology, ICIT 2016",
publisher = "Institute of Electrical and Electronics Engineers Inc.",
address = "United States",

}

TY - GEN

T1 - Methods to estimate the lead time of an order in a flexible flowshop

AU - Weng, Wei

AU - Fujimura, Shigeru

PY - 2016/5/19

Y1 - 2016/5/19

N2 - We consider the problem of estimating lead times of orders that arrive dynamically in a flexible flow shop. When an order arrives, we estimate the time between its arrival and its completion. Good estimation would help improve on-time delivery. Existing estimation methods are mostly designed based on an order's processing time and the shop's inventory status. We improve the accuracy of estimation by developing new methods that further take into account the characteristics of the shop system such as parallelization of queues. We also consider the bottleneck effect, which might largely dominate the waiting time in the system. Results of computational experiments show that the proposed methods outperform existing methods in terms of some accuracy measures.

AB - We consider the problem of estimating lead times of orders that arrive dynamically in a flexible flow shop. When an order arrives, we estimate the time between its arrival and its completion. Good estimation would help improve on-time delivery. Existing estimation methods are mostly designed based on an order's processing time and the shop's inventory status. We improve the accuracy of estimation by developing new methods that further take into account the characteristics of the shop system such as parallelization of queues. We also consider the bottleneck effect, which might largely dominate the waiting time in the system. Results of computational experiments show that the proposed methods outperform existing methods in terms of some accuracy measures.

UR - http://www.scopus.com/inward/record.url?scp=84974534251&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84974534251&partnerID=8YFLogxK

U2 - 10.1109/ICIT.2016.7474954

DO - 10.1109/ICIT.2016.7474954

M3 - Conference contribution

AN - SCOPUS:84974534251

VL - 2016-May

SP - 1353

EP - 1356

BT - Proceedings - 2016 IEEE International Conference on Industrial Technology, ICIT 2016

PB - Institute of Electrical and Electronics Engineers Inc.

ER -