Optimization of bi-objective permutation flow shop scheduling with electricity cost consideration

B. Kurniawan*, S. Fujimura

*この研究の対応する著者

研究成果: Conference article査読

抄録

Increasing energy demand can create undesired problems for many governments worldwide. Several policies, such as time-of-use (TOU) tariffs, have been put in place to overcome such demand. The TOU policy's objective is to reduce electrical load during peak periods by shifting the use to off-peak periods. To that end, this paper addresses the bi-objective permutation flow-shop scheduling, minimizing total weighted tardiness and electricity costs. We propose a meta-heuristic algorithm based on SPEA2 to solve the problem. We conducted numerical experiments to evaluate the efficacy of the proposed algorithm by comparing it with NSGA-II. The results show that the proposed approach was more efficient compare with NSGA-II.

本文言語English
論文番号012045
ジャーナルIOP Conference Series: Materials Science and Engineering
909
1
DOI
出版ステータスPublished - 2020 12月 21
イベント2020 International Conference on Advanced Mechanical and Industrial Engineering, ICAMIE 2020 - Cilegon City, Banten, Indonesia
継続期間: 2020 7月 82020 7月 8

ASJC Scopus subject areas

  • 材料科学(全般)
  • 工学(全般)

フィンガープリント

「Optimization of bi-objective permutation flow shop scheduling with electricity cost consideration」の研究トピックを掘り下げます。これらがまとまってユニークなフィンガープリントを構成します。

引用スタイル