Planning and scheduling in building construction methodologies for construction planning and representation

Naruo Kano

    研究成果: Article

    抜粋

    This study focuses on two methodologies for construction planning and representations. It describes the planning methods of the down-from-the-top system and the up-from-the-bottom system, discussing that the former system is more suitable for construction planning than the latter system. The study first identifies the requirements for adopting the breakdown structures in planning the construction process. It then discusses how the methodologies make breakdown structures from several viewpoints and maintain consistencies in breakdown structures which represent the construction plan. The author concludes that the two methodologies should play an important role in expert systems to aid a manager to make a construction plan.

    元の言語English
    ページ(範囲)89-102
    ページ数14
    ジャーナルMemoirs of the School of Science and Engineering, Waseda University
    発行部数52
    出版物ステータスPublished - 1988

    ASJC Scopus subject areas

    • Engineering(all)

    フィンガープリント Planning and scheduling in building construction methodologies for construction planning and representation' の研究トピックを掘り下げます。これらはともに一意のフィンガープリントを構成します。

  • これを引用