T1 - Self-construction production scheduling system
AU - Xuerui, Zhang
AU - Xue, Hai
AU - Shimizu, Yasuhiro
AU - Fujimura, Shigeru
PY - 2006/1/1
Y1 - 2006/1/1
N2 - At present, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be decreased. This paper shows a prototype of Gantt Chart Interface System that emulates the production scheduling work on papers. Through the analysis of operator's operations, this paper proposes how to extract the master information required by production scheduling. Using the information, the scheduling operators can be supported to accelerate the scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, the extraction mechanism of the master information and operator support functions are proposed through a model expressing a scheduling problem.
AB - At present, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be decreased. This paper shows a prototype of Gantt Chart Interface System that emulates the production scheduling work on papers. Through the analysis of operator's operations, this paper proposes how to extract the master information required by production scheduling. Using the information, the scheduling operators can be supported to accelerate the scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, the extraction mechanism of the master information and operator support functions are proposed through a model expressing a scheduling problem.
KW - Gantt chart
KW - Operation scheduling
KW - Production management
KW - Production scheduling
KW - Self-construction system
UR - http://www.scopus.com/inward/record.url?scp=45149128193&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=45149128193&partnerID=8YFLogxK
U2 - 10.1109/COASE.2006.326935
DO - 10.1109/COASE.2006.326935
M3 - Conference contribution
AN - SCOPUS:45149128193
SN - 1424403103
SN - 9781424403103
T3 - 2006 IEEE International Conference on Automation Science and Engineering, CASE
SP - 519
EP - 523
BT - 2006 IEEE International Conference on Automation Science and Engineering, CASE
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 2006 IEEE International Conference on Automation Science and Engineering, CASE
Y2 - 8 October 2006 through 10 October 2006
ER -