Settlement behaviour of a shield tunnel constructed in subsiding reclaimed area

K. Komiya, K. Takiyama, H. Akagi

研究成果: Conference contribution

7 被引用数 (Scopus)

抄録

This paper focuses on a large settlement behaviour of a shield tunnel, which is constructed in soft alluvial clay strata beneath fresh reclaimed land. The total settlement of the tunnel is more than 0.73 metres and the deformation takes place over more than twenty years after the completion of the tunnel construction. Three dimensional finite element analyses have been carried out to estimate a long-term behaviour of soil and tunnel structure observed in this field. The computed vertical settlement of tunnel structure is compared with the measured data.

本文言語English
ホスト出版物のタイトルGeotechnical Aspects of Underground Construction in Soft Ground - Proceedings of the 5th International Conference of TC28 of the ISSMGE
ページ239-244
ページ数6
出版ステータスPublished - 2006 12 1
イベント5th International Conference of TC28 of the International Society for Soil Mechanics and Geotechnical Engineering, ISSMGE - Amsterdam, Netherlands
継続期間: 2005 6 152005 6 17

出版物シリーズ

名前Geotechnical Aspects of Underground Construction in Soft Ground - Proceedings of the 5th International Conference of TC28 of the ISSMGE

Conference

Conference5th International Conference of TC28 of the International Society for Soil Mechanics and Geotechnical Engineering, ISSMGE
CountryNetherlands
CityAmsterdam
Period05/6/1505/6/17

ASJC Scopus subject areas

  • Geochemistry and Petrology
  • Geotechnical Engineering and Engineering Geology

フィンガープリント 「Settlement behaviour of a shield tunnel constructed in subsiding reclaimed area」の研究トピックを掘り下げます。これらがまとまってユニークなフィンガープリントを構成します。

引用スタイル