Shunt capacitor renewal planning with a cost leveling strategy using the condition age model

Yuta Tanaka, Ken Suzuki, Shinnichi Iwamoto

    研究成果: Article

    抜粋

    With the past high economic growth period in Japan, the power demand has been increasing sharply year by year. Therefore, the Japanese utilities have installed many Shunt Capacitors (SCs) along with the predicted demand in order to keep the voltage profile and stability. Meanwhile, some SCs have aged because they have been used for a long time, and thus, have to be replaced sometime soon. Recently, the usage of the concept of asset managements has been paid attention as economic evaluation techniques in the power system. Therefore we propose a new renewal planning method with cost leveling during the renewal period using the condition age model.

    元の言語English
    ジャーナルIEEJ Transactions on Power and Energy
    131
    発行部数9
    DOI
    出版物ステータスPublished - 2011

    ASJC Scopus subject areas

    • Electrical and Electronic Engineering
    • Energy Engineering and Power Technology

    フィンガープリント Shunt capacitor renewal planning with a cost leveling strategy using the condition age model' の研究トピックを掘り下げます。これらはともに一意のフィンガープリントを構成します。

  • これを引用