抄録
A reliability cost allocation strategy under deregulated generation market is proposed. In deregulated market, which includes many generation companies and customers, it is a significant issue to keep the supply reliability of the customers. In the proposed method, as an index, EUP (Expected Unserved Energy) is applied to evaluate the system supply reliability and reliability cost for the system is allocated to customers based on their desirable EUP value, which indicates the reliability level of customers, and additional cost arising from operations to satisfy the requests of each customer's supply reliability is also investigated. Since additional cost is likely to become higher to satisfy the request of customer seeking the highest reliability, reduction of the cost is achieved by the concept of the reliability cost allocation. The effectiveness of the proposed method is verified through several simulation studies using a test system.
本文言語 | English |
---|---|
ホスト出版物のタイトル | Proceedings of the IEEE Power Engineering Society Transmission and Distribution Conference |
ページ | 319-324 |
ページ数 | 6 |
巻 | 1 |
出版ステータス | Published - 2000 |
イベント | Proceedings of the 2000 Power Engineering Society Summer Meeting - Seattle, WA 継続期間: 2000 7月 16 → 2000 7月 20 |
Other
Other | Proceedings of the 2000 Power Engineering Society Summer Meeting |
---|---|
City | Seattle, WA |
Period | 00/7/16 → 00/7/20 |
ASJC Scopus subject areas
- 工学(全般)
- エネルギー(全般)