Thermal generating unit maintenance scheduling by multi-stage application of simulated annealing

R. Yokoyama, T. Niimura

    研究成果: Article

    抜粋

    This paper presents a multi-stage approach for maintenance scheduling of generating units by simulated annealing. The maintenance procedures are classified into three types differing in outage duration. In the first stage of the scheduling, feasible combinations of maintenance schedule are sought by iterative application of simulated annealing. In the second stage, introduction of minor maintenance is determined to maintain required reserve rate. Based on the feasible mix of maintenance schedule, in the third stage, a global optimum solution is attained by the simulated annealing. The effectiveness of the proposed approach was evaluated by a practical size model analysis and the comparison with enumeration method.

    元の言語English
    ページ(範囲)1531-1535
    ページ数5
    ジャーナルUnknown Journal
    2
    出版物ステータスPublished - 1996

    ASJC Scopus subject areas

    • Hardware and Architecture
    • Control and Systems Engineering

    フィンガープリント Thermal generating unit maintenance scheduling by multi-stage application of simulated annealing' の研究トピックを掘り下げます。これらはともに一意のフィンガープリントを構成します。

  • これを引用