Transmission system expansion planning considering outage cost

Jaeseok Choi, Junmin Cha, Junzo Watada, T. D. Mount, R. Thomas

    研究成果: Conference contribution

    7 被引用数 (Scopus)

    抄録

    This paper proposes a method for choosing the best composite power system expansion plan considering an annual outage cost assessment. The proposed method minimizes the investment budget (economics) for constructing new generating units and transmission lines as well as the annual outage cost subject to deterministic (demand constraint) and probabilistic reliability criterion (LOLER), while considering the uncertainties of system elements. It models the power system expansion problem as an integer programming one. The method solves for the optimal strategy using a probabilistic theory-based branch and bound method that utilizes a network flow approach and the maximum flow-minimum cut set theorem. The proposed method is applied to a 5-bus MRBTS, the test results demonstrate that the proposed method is suitable for solving the composite power system expansion planning problem subject to practical future uncertainties.

    本文言語English
    ホスト出版物のタイトルSecond International Conference on Innovative Computing, Information and Control, ICICIC 2007
    DOI
    出版ステータスPublished - 2008
    イベント2nd International Conference on Innovative Computing, Information and Control, ICICIC 2007 - Kumamoto
    継続期間: 2007 9 52007 9 7

    Other

    Other2nd International Conference on Innovative Computing, Information and Control, ICICIC 2007
    CityKumamoto
    Period07/9/507/9/7

    ASJC Scopus subject areas

    • Computer Science(all)
    • Mechanical Engineering

    フィンガープリント 「Transmission system expansion planning considering outage cost」の研究トピックを掘り下げます。これらがまとまってユニークなフィンガープリントを構成します。

    引用スタイル