抄録
In this paper, the contract path method and MW-mile method that are classified into the embedded cost method are addressed, and a new practical wheeling charging that resolves the existing disadvantages is proposed by using the identification method of transaction paths. By applying the proposed method that reflects the use of transmission systems, the wheeling charge that gives the incentive for the efficient operation of power systems is achieved fulfilling the recovery of the invested cost. In order to verify the practicability of the above mentioned proposal method, several simulations have been conducted on the IEEE 30-bus test system.
本文言語 | English |
---|---|
ホスト出版物のタイトル | Proceedings of the Universities Power Engineering Conference |
出版ステータス | Published - 2009 |
イベント | 44th International Universities Power Engineering Conference, UPEC2009 - Glasgow 継続期間: 2009 9月 1 → 2009 9月 4 |
Other
Other | 44th International Universities Power Engineering Conference, UPEC2009 |
---|---|
City | Glasgow |
Period | 09/9/1 → 09/9/4 |
ASJC Scopus subject areas
- エネルギー工学および電力技術